How to conduct on-site debugging of automatic revolving doors

The on-site calibration of the automatic revolving door is part of the installation and use planning of the revolving door. After purchasing a revolving door, it can be installed, used and calibrated by professional personnel. The revolving door has been successfully installed in the manufacturing and processing plant, and the installation and use, calibration and delivery engineering acceptance have been successfully carried out on the project site. Therefore, the installation, use and calibration of revolving doors are very important. First, let’s talk about the details of on-site calibration of automatic revolving doors.

How to conduct on-site debugging of automatic revolving doors

Usually an automatic revolving door. As a specific entrance, it is usually installed and used during the completion of the project to facilitate the entry and exit of other decorative building materials during the work, and also prevents any impact on the project. For revolving doors during the process, before installing and using the revolving door, it is usually not necessary to complete the pre-embedding treatment before the floor is completed (crystal revolving doors must be pre-embedded).

The automatic revolving door is installed and used after the floor has load-bearing specifications. This is because the revolving door is mainly based on load-bearing standards and everything is installed on the floor. The net weight of a standard two-wing automatic revolving door is about 1.5 to 3 tons. The net weight of a standard three- and four-wing revolving door is about 0.8 to 2 tons. The floor unevenness of the revolving door equipment must be between ±1.5 and 2mm.

To ensure that the revolving door cannot move downward after installation and use, the floor must have load-bearing capacity before installation and use. Automatic revolving door, when the revolving door needs to be installed with floor heating or other support installed on the countertop during installation and use, the construction company or construction unit should notify the revolving door manufacturer in advance to complete the pre-installation. Complete disposal in advance to avoid warranty damage due to the revolving door construction.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2024年12月19日
Next 2024年12月19日

相关推荐

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信