Civil Defense Door Frame Installation Pit Avoiding Manual: 6 fatal details that construction team members will not say

In the past five years of inspection of civil defense engineering, the unqualified rate of door frame installation is as high as 42%! As a technical responsible person who participated in 17 personal defense projects, I found that most of the projects have the problem of \”surprise correction before inspection\”. This article reveals the six key control points that are most easily overlooked in the construction site, and includes real rework cases. It is recommended that engineers collect and prepare them.

Civil Defense Door Frame Installation Pit Avoiding Manual: 6 fatal details that construction team members will not say

1. Positioning and discharging must be \”three aspects\” \”

1. Axis retrieval connection: The deviation between the center line of the door frame and the axle of the civil defense wall is ≤2mm (it is measured that the door fan cannot be closed due to a 3mm deviation)

2. Height control: The top height at the door is 15-20mm lower than the finished building surface (pre-reserved thickness of the decoration layer)

3. Verticality Testing: The vertical deviation of the door frame vertical bar should be ≤2mm/m (it is recommended to use laser pendant retrieval)

2. Embedded parts inspection and acceptance \”three checks and three tests\”

– Check specifications: straight stratum of the rum-shaped steel reinforcement ≥16mm, distance ≤250mm

– Check welding: door frame and embedded parts Welding length ≥80mm (welding height ≥6mm)

– Test firmness: use 1.5kg hand tap without hollowing

(Case: A project failed to detect air tightly in the protective door due to the welding of embedded parts)

3. Install the door frame \”Golden 3 hours\”

3. p>

1. Suspension stage: Use special spreaders, steel wire rope and door frame contact pad rubber protection

2. Fine window: Micro-tuning is completed within 30 minutes after installation (temperature changes can easily lead to deformation of the steel)

3. ​​Simultaneous fixation: adjustable oblique slugging is used, and direct welding of temporary support points is prohibited

Civil Defense Door Frame Installation Pit Avoiding Manual: 6 fatal details that construction team members will not say

IV. Fatal taboos in welding operations

1. Strictly prohibit arcing in the door frame (a project therefore Cracking is ordered to rework)

2. The solder should be welded on layers, and the layer temperature is controlled at 60-80℃

3. Magnetic particle detection and detection must be carried out within 24 hours after welding

5. \”Three Precautions\” for Concrete Stainless Steel

1. Anti-displacement: When the floor is cut, the height difference is ≤500mm

2. Anti-displacement: A cross-support bracket is installed in the door frame (it is recommended to use ∠50×5 corner steel)

3. Anti-leakage: Buried piping at the door frame and concrete joint, with a distance of 300mm

VI. 5 self-checks must be done before the experience

1. Gas densityTest: Use a feeler gauge to check the gap between the closed strips ≤1mm

2. Chain test: The opening force of the door fan is ≤150N (real test data)

3. Grounding resistance: Door frame grounding resistance value ≤0.2Ω

4. Paint film thickness: anti-staining paint ≥120μm, topcoat ≥60μm

5. Finished product protection: Detachable angle steel cover is installed at the bottom of the door frame

Xueyan Teaching: A residential area has a 5mm deviation in the verticality of the door frame, resulting in After the protection door is closed, the light leakage exceeds the standard. In the end, the 1.5m-wide walls on both sides are reconstructed, and 230,000 yuan is directly lost.

Civil defense engineering is nothing small, the quality of the door frame installation is directly related to the combat protection performance. Only by keeping a firm eye on \”mm-level precision control and zero tolerance for quality\” can we pass the most stringent human defense experience. Transfer this article to the project group to help the class team avoid walking!

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年2月9日
Next 2025年2月9日

相关推荐

  • 门套这么重要,别忽略这些安装步骤!

    门洞横梁歪斜、合不上、蹭地板…这些尴尬的状况都与门套息息相关。上图中,规范的门套看上去特别舒服!你知道吗?其实门套的安装有许多规范。通常大家都局限在吊顶、地板、橱柜的安装,既然门套这么重要,别忽略下面的这些安装步骤啊! 首先,根据门洞的尺寸,测量出门框固定的位置,用墨斗弹拉出垂直线,一侧门洞两条垂直线。尺寸测量完毕后,通常师傅会在两侧的垂直线上用冲击钻钻孔,…

    门套门框安装 2023年10月22日
    330
  • 南平市華泰木竹取得木門框板材切削裝置專利,能夠實現板材切削倒角作用效果

    金融界2024年10月23日消息,國傢知識產權局信息顯示,南平市華泰木竹有限公司取得一項名為“一種木門框板材切削裝置”的專利,授權公告號 CN 221849631 U,申請日期為2024年2月。 專利摘要顯示,本實用新型提供瞭一種木門框板材切削裝置,包括操作臺,所述操作臺上表面右側前後兩端均設置有用於實現板材限位的第一限位件,所述操作臺上表面左端中部設置有用…

    门套门框安装 2024年10月30日
    50
  • 自己動手安裝門套 哇 太簡單瞭

    對於想自己安裝木門套的人來說,安裝過程是不熟悉的。木門套安裝從整體上看就2個步驟,第一安裝好木門套,第二就把木門套裝入門洞,看似簡單的個兩個步驟,自己安裝還有一些問題需要註意。 一、木門套安裝 1.先把木門套的各個部位及零件檢查好,看是否有遺漏,一般木門套會包括1條頂框,長度823mm左右;2條側框,長度210mm;門套線;前門框線;後門框線;靜音條;門擋線…

  • 门框不会做人觉悟不够,只配做卤煮

    北京人都知道有个“门框卤煮”,我一直不明白卤煮跟门框有什么关系,现在知道了,门框这东西,只能跟下水配,因为实在是觉悟不够。 要不是门框,这场比赛的比分是多少?大点声告诉我! 数据显示,北京中赫国安本场比赛被对手4次击中门框,最终的比分是1比5。 4+5=? 几来着? 圣贤天帝延庆太子苏亚雷斯爵士真君,请回答—— 得9,对吧。 所以说,门框不会做人,要是会做人…

  • 门和门框缝隙大怎么办?2种方法1分钟解决问题,租房和自住都能用

    “门缝”这个问题,说大不大,说小也不小。 凑合也能过,但要求高的时候就很影响生活质量。冬天吧,它漏风;夏天吧,它进来蟑螂,整个生活鸡飞狗跳也不是不可能。 所以稍微用点心整改一下还是很有必要的。以下就针对自住和租房2种情况分别给出几点整改的思路,希望有用。 一、针对租房住的伙伴 防盗门的密闭性都是比较好的,一般的卧室门这些就会有缝隙(合租的需要注意),蟑螂会从…

    门套门框安装 2023年10月24日
    4830

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信