Global \”Let me go\” my country\’s new generation of wind power installation ship was delivered today

Source: CCTV News Client

Global \"Let me go\" my country\'s new generation of wind power installation ship was delivered today

Reporters today (December 28 ) It was learned from CIMC that the most advanced fourth-generation self-elevating and self-propelled wind power installation ship in China – the \”Rail China Wind Power 2000\” wind power installation ship was delivered in Yantai. my country\’s offshore wind farm development has continued Add weight.

Global \"Let me go\" my country\'s new generation of wind power installation ship was delivered today

The \”Rail China Wind Power 2000\” is 136 meters long, 53 meters wide, and has a speed of about 8 knots. It is equipped with a DP-2 dynamic positioning system and can flexibly cope with the challenges of offshore wind power construction in water depths below 80 meters.

The relevant person in charge said that the \”Rail China Wind Power 2000\” wind power installation ship has 3 side thrusters, 3 full-rotating stern thrusters, and an unlimited navigation area with certification. It can sail independently to any designated operation around the world. Place.

Global \"Let me go\" my country\'s new generation of wind power installation ship was delivered today

In recent years, our countryTo increase the development of offshore wind power, wind power installation ships have always been one of the bottlenecks in the development of offshore wind power in my country and even around the world. In particular, the number of wind power installation ships with the ability to install 20MW units is extremely limited. The \”Rail China Wind Power 2000\” delivered this time has a localization rate of more than 95%. The 2,000-ton pile-type full-slewing crane equipped at the stern of the ship enables it to install various types of offshore wind turbines of 20 MW and above.

The relevant person in charge said that domestic mainstream wind power installation ships generally work in water depths below 70 meters, with a lifting capacity of about 1,500 tons and used for offshore wind turbines below 15 MW. installation. Our project has the ability to install various types of offshore wind turbines of more than 20 MW in a water depth of 80 meters. Its performance has raised the technical level of my country\’s self-elevating wind power operating platforms to a new height.

(CCTV reporter Zhang Wei)

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2025年1月3日 09:11:58
下一篇 2025年1月3日 09:16:19

相关推荐

  • 29个主流门窗品牌榜单推荐

    了解过门窗的都知道如今行业有几万个门窗厂家,对于业主朋友们来说选择一个靠谱的品牌至关重要,但表面同质化的产品太多应该怎么选择?今天小编就来介绍一下现如今29个主流门窗品牌榜单! 国际顶级系统门窗:旭格门窗、威克纳门窗,这两个品牌在海内外都拥有极高的影响力,同时专利技术也是遥遥领先的。 奢华高端门窗品牌:阿鲁克门窗、霍柯门窗、安德森门窗,高品质以及优质的服务是…

    门窗安装 2024年1月23日
    650
  • 读书是通往世界最好的路:9个方法养成阅读好习惯

    阅读是开启智慧大门的钥匙,也是通往世界的最佳之路。今天我将为你分享9个方法,帮助你养成良好的阅读习惯,让你走上阅读的康庄大道。 方法一:定下目标 设置每天或每周要阅读的书籍数量,并制定合理的时间计划。例如,每天读30分钟或每周读两本书。挑战自己,坚持达到目标。 方法二:选择适合的阅读环境 寻找一处安静、舒适的阅读角落,远离噪音和干扰。这样的环境可以帮助你集中…

    门窗安装 2024年1月20日
    630
  • 装修步骤和注意事项

    装修的步骤和注意事项挺多的,还是有必要多了解一下!无论是怎么装修或找谁装修,都要按部就班的进行。 1、前期设计 在家庭装修工程实施前,要确定房子的设计和房屋的面积,同时还要对摆放家具的尺寸进行测量。 2、主体拆改 主体拆改主要包括拆墙、砌墙等项目,拆除后产生的垃圾要及时清理,以保证室内的清洁度,从而为日后的施工打下基础。 3、水电改造 在水电改造前,需要确定…

    门窗安装 2024年5月9日
    110
  • 笛卡尔《谈谈方法》读书笔记

    《谈谈方法》是笛卡尔的一部代表作,也是他的处女作。这本书以半自传的方式,深入浅出地论述了自己的新的哲学方法及形成过程。全书分为六部分,包括对各门学问的看法、作者寻求该方法的几条原则、从该方法中引导出的几项行为准则、作者用来证明神的存在、人的灵魂存在的理由、作者研究过的一系列物理问题,以及作者认为一定要做哪些事情才能使自然研究更进一步,以及促使其撰写此书的理由…

    门窗安装 2023年12月17日
    690
  • Jiangxi Hefeng electrolysis workshop officially entered the equipment installation stage

    Recently, Jiangxi Hefeng\’s 100,000-ton annual recycled electrolytic copper energy-saving and emission-reduction technological transformation project, undertaken by Shanghai …

    门窗安装 2025年1月1日
    110

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信