What are the process steps for house decoration? Decoration company experience answers here

Decoration itself is a tedious and complicated matter, so you must understand the relevant processes clearly during decoration. So what are the process steps of house decoration? Let’s take a look at Kunming Decoration Network!

What are the process steps for house decoration? Decoration company experience answers here

House decoration steps

1. Preliminary design

First of all, design Before finding a good decoration company, it is very important for the owner to find the right home improvement company. Regular decoration companies can not only produce complete design drawings, but also effectively solve problems that arise during decoration. Secondly, the house must be measured, such as the area required for decoration and the location of furniture.

2. Main body demolition and modification

After the preliminary design is completed, the next step is the main body demolition and modification, which includes demolishing walls, building walls, etc. However, it should be noted that the load-bearing walls of the house cannot be demolished or modified, as this will pose a threat to the safety of the house.

3. Water and electricity renovation

After the main body is dismantled and modified, the water and electricity renovation will begin. First, the location of the cabinets to be installed must be measured, and the location of the cabinets to be installed must be measured and prepared in advance. Leave the location of the water outlet and socket. Water and electricity renovation is a hidden project, so special attention must be paid to every detail to facilitate subsequent daily life.

4. Wood, tiles, and oil

When constructing wood, tiles, and oil, the principle of who gets dirty first should be followed. The construction method is from top to bottom, so as to keep the indoor clean without having to clean the room repeatedly.

5. Kitchen and Bathroom Decoration

The first step in kitchen and bathroom installation is to build the suspended ceiling of the kitchen and bathroom. When selecting materials, try to choose anti-corrosion and moisture-proof materials. Secondly, the cabinet installation must be carried out strictly in accordance with the design drawings, the size must be grasped, and the bathroom floor drain must be installed in place.

What are the process steps for house decoration? Decoration company experience answers here

6. Post-installation

Post-installation is the aftermath of the entire decoration process, such as the installation of doors, lamps, sanitary ware, etc. Wait for all After the things to be installed are installed, the next step is to clean the room thoroughly, and then the furniture comes in. Once the furniture is placed, the house decoration is completed.

What is the budget for house decoration?

1. Wall and floor tiles

Living room, kitchen, bathroom – No. Bell, Baxter, etc. 14,162 yuan, marble: threshold, bay window, bathroom basin – gold thread beige, Chinese black, etc. 3,550 yuan, floor: room, living room 16,154 yuan toilet: Lejia on the first floor, 1,810 yuan on the second floor Anhua 800 yuan.

2. Faucet

Shower room, basin, water tank, washing machine 4105 yuan, mop head (2 pieces) and falling water: Clayton 320 Yuan, floor drain, copper corner Valve: Tiansha 739 yuan, plate, line: Green Peak, Meranti, etc. 12,933 yuan, ceiling material: Jialecai 1,898 yuan, category: door, sliding door: Dele sliding door 2,989 yuan, Golden Ax Meranti craft door , cabinet doors, etc. 4158 yuan.

3. Furniture hardware

Hinges, hanging wheels, hanging rails, door catches, etc. – Pinliang, APK, Xinkai, Anpac 727 Yuan, paint coating: Li Bang and Ge brand 7211 yuan; paint accessories 1939 yuan, energy water heater 2200 yuan, Kaixin exhaust + gas stove 2240 yuan, Opp bathroom heater (2 pieces) 1020 yuan, water pipe: Zunya PPR hot melt pipe 2640 yuan.

4. Auxiliary materials

Panda wire 3885 yuan, Xiangpai cement 2475 yuan, other auxiliary materials: yellow sand, nails, glue, twist drill, etc. 3771 Yuan; plumbing hardware, etc. 1,114 Yuan; electrical accessories 2,427 Yuan. Labor cost 14,000 Yuan, design fee, management fee, tax, etc.: 4,000 Yuan (about).

The above is what Kunming Zhuangyi.com shared with you this timeAn introduction to the process steps of house decoration. The above prices are for reference only. I hope it will be helpful to your home decoration.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2024年12月29日 09:18:53
下一篇 2024年12月29日 09:24:56

相关推荐

  • 长沙防水补漏维修过程和步骤

    步骤一:检查漏水情况 首先,作为一名资深的维修师傅,在解决防水补漏问题之前,我们需要对漏水情况进行仔细的检查。这包括: 【专业师傅快速上门,专业服务有保障】 (此处已添加小程序,请到今日头条客户端查看) 检查漏水的位置和程度。 观察是否存在水渍、水迹或水渗漏的迹象。 检查可能的漏水源,如屋顶、墙壁、地板等。 步骤二:确定防水补漏材料和工具 根据检查结果,我们…

    门窗安装 2024年2月27日
    480
  • 定制室内门还不知道怎么测量安装?二十年老师傅手把手教你!

    今天向大家介绍在定制一套新材料门前,如何先测量门洞尺寸 第一步我们先测量门洞的宽度,测量的起点是左侧门垛到右侧门垛,门洞的宽度需测量上中下3个数值,取测量中的最小值作为参考数据 第二步我们测量门洞的高度,测量的起点的最上面横梁到最下面地面,门洞的高度需测量左中右3个数值,取测量中最小值作为参考数据 第三步我们测量门洞的墙体厚度,测量的起点是门洞墙体的前面到后…

    门窗安装 2023年10月14日
    3590
  • More and more people have chosen the Aluminum Doors for Decoration of Bridges. What is the good thing about it? What is the \”Down Bridge\”?

    The first step in decorating an old house is to change doors. Doors and windows are an important part of the residence. The impact of \”doors and windows\” on our lives…

    门窗安装 2025年2月7日
    110
  • 门窗怎么正确安装?

    现场门窗如果正确安装?希望此篇能帮助到你,一起来认识一下吧! 三分制作,七分安装 门窗安装对于门窗整体品质的影响非常大! 1 门窗进场验收控制要点 (1)门窗主材用料厚度、颜色;玻璃厚度、颜色、安全玻璃部位等必须符合设计要求;中空玻璃是否雾化漏气。 (2)当门窗高度大于一个层高或≥3米时,门窗应按幕墙考虑,受力构件必须和结构主体通过预埋件连接,并保证强度和刚…

    门窗安装 2023年10月21日
    660
  • 不装门槛石?真信你就傻眼了

    门槛石又叫过门石,一般是用于两个空间的连接位置,长这样↑↑↑ 现在网上流行一种说法——门槛石没啥用,不如瓷砖通铺。 门槛石的功能,貌似就是用于两种不同材质之间做过渡,装不装无关紧要。 嘿嘿,真信就等着傻眼吧,门槛石的实际作用没那么简单。 像地面有高度差、或挡水需要的情况,门槛石都是必须要装的,比如大门、卫生间门、阳台平开门等等。 1、大门: 大门处是一定要装…

    门窗安装 2023年10月26日
    710

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信