Analysis of common problems at fire acceptance site – fire door 1

Analysis of common problems at fire acceptance site - fire door 1

Acceptance items:Fire separation

Analysis of common problems at fire acceptance site - fire door 1

On-site problem description 1:

The fire door is not equipped with a door closer, and the double fire door is not equipped with a sequencer.

When the normally open fire door is a sub-door, there is no door closer on the sub-door.

Relevant specification requirements:

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

6.5.1 The setting of fire doors should comply with the following regulations:

3. Except for tube well access doors and residential doors, fire doors should have a self-closing function.

\”Code for Construction and Acceptance of Fireproof Roller Shutters, Fireproof Doors, and Fireproof Windows\” GB50877—2014:

5.3.2 Normally closed fire doors should be equipped with door closers, and double-leaf and multi-leaf fire doors should be equipped with sequencers.

Analysis of common problems at fire acceptance site - fire door 1

Onsite problem description 2:

The evacuation doors in some parts are not equipped with Class A fire doors, such as the doors of the smoke prevention and exhaust machine room opening into the building, the doors of the evacuation aisles in the fire protection zone, Doors in underground garages opening to residential evacuation stairwells, doors on firewalls, etc.

The civil air defense area is adjacent to the fire protection zone. Only civil air defense doors are seen, and no Class A fire doors are installed.

Relevant specification requirements:

\”General Specifications for Building Fire Protection\” GB55037—2022:

6.4.2 Doors in the following locations should be Class A fire doors:

1. Doors set on the fire wall and doors set on the fire zone for evacuation corridors;

2. Set up a fire partition wall with a fire resistance limit of not less than 3.00hdoor;

3. Elevator room, The door connecting the evacuation stairwell to the garage;

4. Indoor doors opening to the front room of the evacuation corridor and evacuation doors in the evacuation room;

5. Doors leading from the warehouse to evacuation walkways or evacuation stairwells in multi-story Category B warehouses and underground, semi-underground and multi- and high-rise Category C warehouses.

6.4.5 Civilian air defense projects in daily use The fire resistance of protective doors, protective airtight doors, and airtight doors that replace Class A fire doors should not be lower than the requirements of Class A fire doors, and should not be used for evacuation exits in commonly used public places.

\”Code for Fire Protection Design of Buildings\” GB50016—2014 (2018 edition):

6.2.7 The doors of ventilation, air conditioning machine rooms and power transformation and distribution rooms that open into the building should use Class A fire doors, and the fire control room and other equipment rooms open to the doors in the building. Doors should be Class B fire doors.

\”Technical Specifications for Fire Water Supply and Fire Hydrant Systems\” GB50974—2014:

5.5.12 The fire pump room shall comply with the following requirements:

3. The fire pump room attached to the building should be separated from other parts by partition walls with a fire resistance rating of not less than 2.00h and floors of 1.50h. Its evacuation door should lead directly to the safety exit and open Doors to evacuation corridors should be Class A fire doors

\”Code for Fire Protection Design of Garages, Repair Garages and Parking Lots\” GB50067-2014:

6.0.7 For underground garages and semi-underground garages connected to residential basements, evacuation stairs in the residential part can be used for personnel evacuation; when it is not possible to directly enter the evacuation stairwell in the residential part, an evacuation staircase should be installed between the garage and the residential part. The connecting aisles should be separated by fire-resistant partition walls, and the doors of the garage opening to the aisles should be Class A fire-resistant doors

Analysis of common problems at fire acceptance site - fire door 1

On-site problem description 3:

The underground storage room does not use Class B fire doors;

The public kitchen in a public building is not separated from other parts as required by regulations.

Related specification requirements:

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

6.2.3 The following parts of the building should be separated from other parts by fire partition walls with a fire resistance rating of not less than 2.00h. Doors and windows on the wall should be Class B fire doors and windows. If there are difficulties, fire shutters can be used, but Shall comply with the provisions of Article 6.5.3 of this specification:

4. Affiliated warehouses in civil buildings and auxiliary rooms behind theaters;

5. In addition to kitchens in residential buildings, public kitchens in dormitories and apartment buildings and kitchens in other buildings;

Analysis of common problems at fire acceptance site - fire door 1

The picture comes from the Internet. If there is any infringement, please contact us to delete it.

Message at the end of the article:

Good-looking skins are the same, but interesting souls Pick one out of a million.

@binmayedu (firefighting) is with you, let’s be interesting together!

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网的头像华夏门网
上一篇 2024年12月25日 09:19:15
下一篇 2024年12月25日 09:36:46

相关推荐

  • 四川巴中业主怒砸防火门赔钱后免处罚:写道歉书被公布小区群

    巴中城区置信逸都花园一业主,因为一些问题怒砸防火门和电梯轿厢内设施,被新进来的物业公司调取监控确定身份,报警后赔偿3500元免于刑事处罚。该事件后续,涉事业主被迫写道歉书,后被公布于业主群: 业主群友议论:业主a说,有一句话叫一个心里阴暗的人看满世界都无光,有的人天生极端,对别人的付出熟视无睹。新物业进来一直在改变有的人始终不满意,故意找茬,故意损毁公共财物…

    防火门 2023年12月16日
    140
  • 防火门检查常用条款

    一、《建筑设计防火规范(2018年版)》(GB50016-2014) 6.5.4防火门的设置应符合下列规定: 1设置在建筑内经常有人通行处的防火门宜采用常开防火门。常开防火门应能在火灾时自行关闭,并应具有信号反馈的功能。 2除允许设置常开防火门的位置外,其他位置的防火门均应采用常闭防火门。常闭防火门应在其明显位置设置“保持防火门关闭”等提示标识。 3除管进检…

    防火门 2023年11月28日
    1400
  • 苏州一小区业主私自拆改楼道防火门,邻居:多次向物业社区反映,

    嘿,听说有人玩火,可不是在炉子上烧饭哦,而是在苏州一小区搞出了点火花。你猜怎么着?业主私自拆改楼道的防火门!对,就是那个为了我们的安全才装的门,居然被拆了个精光。 我说,这不是开玩笑的事情啊!邻居们可不干了,据说多次向物业社区反映了,可这热锅上的蚂蚁们,反应是啥呢?零!物业一脸无辜,大概是觉得自己没执法权,然后居然还说已经上报城管和居委会了。哎呀呀,这不是把…

    防火门 2024年3月3日
    940
  • 防火门产品知识科普及消费提示

    防火门是一种在规定时间内能同时满足耐火完整性和耐火隔热性的防火分隔构件,它除了具有普通门的功能外,还具有防火、隔烟、阻挡高温的特殊功能,在一定时间内阻止火势蔓延,确保人员及时安全疏散,广泛应用于高层建筑、商城、宾馆、娱乐场所等重要的公共建筑。防火门作为保障生命安全的第一道防线,也作为建筑消防设施中一个极其重要的组成部门,其产品质量越来越受到人民群众的高度重视…

    防火门 2023年11月3日
    160

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信