Analysis of common problems at fire acceptance site – fire door 1

Analysis of common problems at fire acceptance site - fire door 1

Acceptance items:Fire separation

Analysis of common problems at fire acceptance site - fire door 1

On-site problem description 1:

The fire door is not equipped with a door closer, and the double fire door is not equipped with a sequencer.

When the normally open fire door is a sub-door, there is no door closer on the sub-door.

Relevant specification requirements:

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

6.5.1 The setting of fire doors should comply with the following regulations:

3. Except for tube well access doors and residential doors, fire doors should have a self-closing function.

\”Code for Construction and Acceptance of Fireproof Roller Shutters, Fireproof Doors, and Fireproof Windows\” GB50877—2014:

5.3.2 Normally closed fire doors should be equipped with door closers, and double-leaf and multi-leaf fire doors should be equipped with sequencers.

Analysis of common problems at fire acceptance site - fire door 1

Onsite problem description 2:

The evacuation doors in some parts are not equipped with Class A fire doors, such as the doors of the smoke prevention and exhaust machine room opening into the building, the doors of the evacuation aisles in the fire protection zone, Doors in underground garages opening to residential evacuation stairwells, doors on firewalls, etc.

The civil air defense area is adjacent to the fire protection zone. Only civil air defense doors are seen, and no Class A fire doors are installed.

Relevant specification requirements:

\”General Specifications for Building Fire Protection\” GB55037—2022:

6.4.2 Doors in the following locations should be Class A fire doors:

1. Doors set on the fire wall and doors set on the fire zone for evacuation corridors;

2. Set up a fire partition wall with a fire resistance limit of not less than 3.00hdoor;

3. Elevator room, The door connecting the evacuation stairwell to the garage;

4. Indoor doors opening to the front room of the evacuation corridor and evacuation doors in the evacuation room;

5. Doors leading from the warehouse to evacuation walkways or evacuation stairwells in multi-story Category B warehouses and underground, semi-underground and multi- and high-rise Category C warehouses.

6.4.5 Civilian air defense projects in daily use The fire resistance of protective doors, protective airtight doors, and airtight doors that replace Class A fire doors should not be lower than the requirements of Class A fire doors, and should not be used for evacuation exits in commonly used public places.

\”Code for Fire Protection Design of Buildings\” GB50016—2014 (2018 edition):

6.2.7 The doors of ventilation, air conditioning machine rooms and power transformation and distribution rooms that open into the building should use Class A fire doors, and the fire control room and other equipment rooms open to the doors in the building. Doors should be Class B fire doors.

\”Technical Specifications for Fire Water Supply and Fire Hydrant Systems\” GB50974—2014:

5.5.12 The fire pump room shall comply with the following requirements:

3. The fire pump room attached to the building should be separated from other parts by partition walls with a fire resistance rating of not less than 2.00h and floors of 1.50h. Its evacuation door should lead directly to the safety exit and open Doors to evacuation corridors should be Class A fire doors

\”Code for Fire Protection Design of Garages, Repair Garages and Parking Lots\” GB50067-2014:

6.0.7 For underground garages and semi-underground garages connected to residential basements, evacuation stairs in the residential part can be used for personnel evacuation; when it is not possible to directly enter the evacuation stairwell in the residential part, an evacuation staircase should be installed between the garage and the residential part. The connecting aisles should be separated by fire-resistant partition walls, and the doors of the garage opening to the aisles should be Class A fire-resistant doors

Analysis of common problems at fire acceptance site - fire door 1

On-site problem description 3:

The underground storage room does not use Class B fire doors;

The public kitchen in a public building is not separated from other parts as required by regulations.

Related specification requirements:

\”Code for Fire Protection Design of Buildings\” GB50016-2014 (2018 Edition):

6.2.3 The following parts of the building should be separated from other parts by fire partition walls with a fire resistance rating of not less than 2.00h. Doors and windows on the wall should be Class B fire doors and windows. If there are difficulties, fire shutters can be used, but Shall comply with the provisions of Article 6.5.3 of this specification:

4. Affiliated warehouses in civil buildings and auxiliary rooms behind theaters;

5. In addition to kitchens in residential buildings, public kitchens in dormitories and apartment buildings and kitchens in other buildings;

Analysis of common problems at fire acceptance site - fire door 1

The picture comes from the Internet. If there is any infringement, please contact us to delete it.

Message at the end of the article:

Good-looking skins are the same, but interesting souls Pick one out of a million.

@binmayedu (firefighting) is with you, let’s be interesting together!

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网的头像华夏门网
上一篇 2024年12月25日 09:19:15
下一篇 2024年12月25日 09:36:46

相关推荐

  • 选购防火窗,中空防火玻璃是您的不二选择

    选购防火窗,中空防火玻璃是您的不二选择 在如今的社会,防火安全成为家装必备的一项重要条件。而作为防火安全的第一道防线,防火窗的选择尤为重要。中空防火玻璃作为一种具备优异防火性能的材料,成为了绝大多数人的首选。 为什么选择中空防火玻璃呢?首先,中空防火玻璃具备出色的隔热性能。中空防火玻璃采用了双层玻璃结构,中间夹层充满了干燥的气体,形成了良好的隔热屏障。这种结…

    防火门 2024年1月11日
    340
  • 2024巴黎备忘录FIC已开始,聚焦防火门检查

    日前,巴拿马海事局发布了海事通告,通知运营商关注巴黎备忘录组织关于防火门方面的集中专项检查行动(FIC)。 在此过程中,船旗国检查员及认可组织(RO)应严格聚焦通告中提及的关键检查要素。巴拿马海事局特此敦促所有相关方仔细研读本通告内容,并全力确保各自操作符合既定的检查标准与要求。 以下要点是本次FIC的一部分范围: ✦ 检查防火门控制面板上的指示灯(如已配备…

    防火门 2024年7月25日
    610
  • ☆防火门、防火卷帘等防火分隔设施的检查和功能测试

    这是维保方向的一道必考题! A)防火门的检查和功能测试 ①检查防火门的数量、规格、型号和安装位置是否与设计文件一致。 ②将消防联动控制器设置为\”自动允许\”状态,触发所在防火分区内两个触发装置(两只独立的火灾探测器或1只火灾探测器+1只手动火灾报警按钮),检查防火门的关闭情况,防火门监控器指示变化情况,消防控制室相关控制和信号反馈情…

    防火门 2024年4月12日
    960
  • 什么是超大防火门

    防火门是没有固定规格的,一般是根据用户预留门洞尺寸而订作,我们今天所谈到的防火门尺寸大小限制是指常规情况下行业及资质制定部门所采用的门型尺寸。目前绝大部分企业所生产防火门最大尺寸不超2100mmx2300mm,无法满足部分商业展馆建筑大洞口门洞、配电站、厂矿企业的车间的需求。 ››超大防火门定义‹‹ 超大尺寸防火门是根据消防产品55号文件规定:防火门单门宽1…

    防火门 2023年10月7日
    720
  • 防火门开关差距大到惊人,救援现场揭秘真相

    本文内容来自于网络,若与实际情况不相符或存在侵权行为,请联系删除。 常闭式防火门是高层建筑消防安全的重要防线。然而,记者采访发现,许多地方的常闭式防火门常年敞开,疏散通道被堵塞。这不仅会威胁人们的生命安全,还会加大灾害的损失。 在杭州的一家服装批发市场,杂物堆积在消防疏散通道上,甚至占用了通道的大半。连安全出口门前的疏散通道也堆满了杂物,难以通行。在黑龙江哈…