A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

Decoration is a complicated and tedious process. If you don’t know how to decorate, you may take many detours in the first decoration, which will cause unnecessary waste. Especially for some owners who do not know what the requirements are for the first decoration, and they do not know what the decoration order is, which leads to many details not being done well, and in the end they will leave many regrets.

Today we will take a look at the experiences of those who have experienced it and summarized the construction requirements of the four stages of decoration for you. Let’s take a look together below.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

The first phase of decoration: basic construction requirements for hydropower

(I) What are the key points of the hydropower stage?

To ensure reasonable wiring, no safety hazards should be left

The first stage is mainly water and electricity renovation, and the water and electricity are decoration. The key point is also a difficult point. If you cannot guarantee the construction of the plumber, then problems will easily arise during subsequent use. The most important thing for the plumber is to understand the switches and sockets of the waterways and lines in each room, and ensure that the circuits of each socket are It is usable, and there is no risk of water leakage in the pipes on the waterway.

During construction, plumbers will also wire according to the characteristics of each room, such as kitchens, bathrooms and air conditioning sockets. The refrigerator sockets should be separated and cannot share one socket to avoid excessive electricity use.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

Do it well When accepting materials, you should not be greedy for small gains

Human and electricity materials are also the most easily overlooked stage in the entire decoration. Many owners do not pay attention to hydropower materials and think that they are hidden in the wall anyway. It can\’t be seen afterwards. In fact, this is a big hidden danger. If the material selection is not good, water leakage and electricity leakage will occur, and various problems will arise in the future, which will also bring us living. It has a significant impact, so we must pay attention to the selection and acceptance of hydropower materials.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

(II) Pit avoidance suggestions in the hydropower stage

1. The refrigerator must be powered separately, and the socket cannot be shared.

The refrigerator socket cannot be shared with other electrical sockets. Let it use electricity alone to avoid the use of other electrical appliances. Excessive electricity causes the refrigerator to catch fire and damage, which will seriously affect our living safety.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

2. Important electrical appliances need to be laid out in advance, they cannot In the water and electricity stage, in addition to laying out water pipes and wires, we must also make the socket layout in each room, so as to ensure the safety and convenience of subsequent electricity use. When laying out sockets, we should use a socket in the key areas of each room, such as the kitchen, bathroom, living room, bedroom lamps, TVs, air conditioners, etc. required sockets in advance. OK.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

The second phase of decoration: What is the focus of the waterproofing project?

(1) Basic construction requirements for waterproofing

Ensure that the number of brushing is qualified and you cannot cut corners

The second stage is the waterproofing project that everyone is most afraid of. Every time when it comes to waterproofing, everyone has a helplessness. And the fear, because the waterproofing project is really easy to cut corners, we need to do a good job of waterproofing construction. The first thing is to ensure that the number of times the paint can meet the standard requirements. Only by ensuring the waterproof coating of floor drains, pipes and walls Only evenly cover our waterproofing can be done.

If you cut corners and apply it casually, then water leakage will be prone to subsequent problems.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

Ensure that the waterproof height meets the standards and do not be lazy

The second is to ensure that the waterproof height meets the standards. If the plumber is lazy during construction and only applies a small piece of waterproof coating, it will lead to subsequent water leakage. Water will flow to our walls, affecting the aesthetics of the interior and affecting our living safety. Therefore, it is necessary to ensure that the waterproof height meets our decoration requirements.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

(2) Pit avoidance suggestions in the waterproofing stage

tips①. Waterproofing must be conducted to ensure the waterproofing effect

The most important thing for the waterproofing worker after the construction is completed. It is necessary to conduct a closed water test. Only after a 48-hour closed water test can we determine whether our waterproofing effect is good. We can also use this method to check whether our waterproofing project is qualified to avoid water leakage in the later stage.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

The third stage of decoration: What are the precautions for woodworking technology?

(I) Key requirements for woodworking stage

The key is to ceiling design, and the visual effect should be paid attention to

The third stage is woodworking technology, and for the construction of woodworking technology, the most important thing is to pay attention to ceiling design. If you don’t make a suspended ceiling, it will easily affect the beauty of the interior and the height of the interior.

When designing a suspended ceiling, you must also ensure that the shape and style of the suspended ceiling are in line with the overall shape of the house. The decoration style cannot be selected casually to avoid inappropriate ceilings affecting our interior. /p>A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

The key point is The wooden doors are installed on site to ensure the correct functional direction

Another key is to install wooden doors on site. Wooden doors are essential furniture for our homes. When installing, you must pay attention to the functional direction of the doors to ensure the doors. The location and direction are in line with our usage habits. Then, when installing, you must ensure that the gaps in the door are suitable and that too large gaps cannot affect our living safety and privacy.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

(II) Tips for avoiding pits during the woodworking stage

tips①. Wooden doors should be measured in advance to avoid inappropriate installation

whether it is a suspended ceiling or The installation of doors requires measurement of size in advance. Although most furniture is now produced according to standard sizes, the size of our home spaces is also different. Standard sizes cannot be simply applied directly, such as the size of wooden doors. We should measure the size and width of the door opening in advance to avoid the inability to use the door function due to insufficient measurement or inappropriate measurement of the size, which directly affects our use.

A person who has experienced it summarizes: Some practical suggestions for the four major stages of decoration, and the construction details must be well followed.

Decoration Phase 4: Details and suggestions for tiles and pit avoidance

(I) Things to note in tiles

The key is to choose tiles to avoid buying inferior tiles

The last stage is the tiling process, and the tiling process mainly involves laying tiles. It seems simple, but there are many details in it. , for example, the choice of ceramic tiles is the key. We should choose the right tiles based on the home functions, such as the kitchen andAnti-slip tiles should be chosen in the bathroom, while polished tiles can be chosen in the living room, and glazed tiles can be chosen in the bathroom space, so as to ensure the functionality and aesthetics of each space.

The key is to lay the bricks, and it cannot be laid incorrectly or cracked

The tile laying process is relatively cumbersome, like the tile laying process It can also be divided into many details, such as looking at bricks, paving techniques, and cutting bricks. These links need to be completed by a professional construction team, and you cannot do them casually.

If you hire an unprofessional construction team and do not lay the bricks or lay them flat because you are lazy, then various safety hazards will arise in subsequent use. Influence our living experience.

If you don’t want to regret it later, it will affect our living experience, the most important thing is to check the construction details at every stage and see if the construction team has implemented it as required. Prevent problems later.

Decoration is a very long process. In this process, we must not only be patient, but also know the construction requirements of each stage, because the construction requirements of each stage are different, and we cannot generalize. , If we don’t know how to decorate, it is recommended that we ask a professional construction team to carry out the construction for us.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2025年2月24日 09:59:13
下一篇 2025年2月24日 10:07:22

相关推荐

  • 《门》西方经典散文欣赏

    《门》是美国作家克里斯托弗·莫利创作的一篇哲理性散文。 【原文】 开门和关门是人生中含意最深的动作。在一扇扇门内,隐藏着何等样的奥秘! 没有人知道,当他打开一扇门时,有什么在等待着他,即使那是最熟悉的屋子。时钟滴答响着,天已傍晚,炉火正旺,也可能隐藏着令人惊讶的事情。也许是修管子的工人就在你外出之时已经来过,把漏水的龙头修好了。也许是女厨的忧郁症突然发作,向…

    门业资讯 2023年11月3日
    190
  • 远超智慧(CBD家居)丨简而雅、明媚而随性,一座捕捉时光的房子

    灵动而富有阳气,心就栖息在烟火里 “家之精华,源于家具。简约设计,尽在掌控。” 设计师从美与生活出发,本着家是“居住之地,润养之地,生发之地”的原则,软硬装巧妙呼应,以色、材、设的空间美学手法,打造一个简朗而随性的优雅生活。 关于生活这本书 由自己慢慢填满 光透过大开窗洒下来,模糊了客厅与休闲区的界限,一边是烟火四季,一边是四时悠闲与美景,这是专属于长直厅的…

    门业资讯 2024年5月30日
    120
  • 8个颜值高还便宜的家居小件,用过后就再也戒不掉了,太实用了

    你家里有哪些让自己引以为傲的家居小物呢?我家的一些小件家居产物,真是让我觉得颜值又高又便宜实用,确实值得买。 今天,我就和各位小伙伴分享一下我家的这些家居小件,说句大言不惭的话,有时候我自己都会对着镜子跟自己说一句“你怎么这么会买呢”! 一、零食小推车 相信很多人对零食小推车的印象,都停留在那种普通造型的架子,但实际上,我个人感觉这种两层的零食小推车用起来更…

    门业资讯 2024年3月5日
    200
  • 2个一定要知道的“家居常识”,为了让生活更精致,更为了健康

    在这个快节奏的时代,拥有一个舒适且健康的家居环境已经成为许多人追求的目标。家不仅是休息和放松的地方,更是我们与家人共同度过美好时光的港湾。要实现这一目标,有一些家居常识是不可忽视的。以下将详细介绍两个关键的家居常识,这不仅能提升生活的品质,还能确保你和你家人的健康。 室内空气质量:隐形的健康守护者很多人对室内空气质量的关注远远不够,往往只关注表面的干净整洁,…

    门业资讯 2024年10月6日
    80
  • The 10 decoration experiences of people who have experienced it are all pitfalls that have been personally stepped on! I hope newcomers can avoid detours in decoration

    There are always some problems encountered during the home decoration process, especially for newbies in decoration, which are more likely to be cheated. Today, the editor will sha…