The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Those who are planning to start a renovation probably don’t know how to start

There are too many details to worry about when decorating, when to buy materials and how to proceed Oversight

This is so heartbreaking

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Here is a complete decoration process for everyone

Follow the pictures step by step and take you step by step

Gives you a method for decoration, just copy the homework according to the table and it will be done!

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/E.Ma Interior design

Decoration process

Preliminary design

01 ) Find a designer

Construction period: 1 to 2 months

02 ) Measurement

Construction period: 1 day

03 ) Design planning

Construction period: 2 to 3 months

04 ) Find a construction team

Construction period: 14~21 days

05 ) Material procurement

Construction period: 1 day

Main material:Floor heating, Air conditioner, Fresh air system, Doors and windows, it is recommended to start purchasing after the design proposal is completed

Hardware construction

01 ) Dismantle and modify

Construction period: 3 to 7 days

02) Build a wall

Construction period: 7 days

03 ) Water and electricity

Construction period: 10~20 days

Main material:Toilet sanitary ware, Kitchen gas stove, Range hood, Customized cabinet, make an appointment before the water and electricity comes in7 to 10 daysConfirm

04 ) Air conditioning, floor heating, and fresh air system installation

Construction period: 5 to 6 days

05 ) Mason

Construction period: 21 to 28 days

Main material:Marble or Tile , purchase it 7 to 10 days before the masons enter the site. Wood floor, Door panel, Suspended ceiling must be determined at this time, which usually takes 2Customized every week to one month

06 ) Woodwork

Construction period: 1 to 1.5 months

Main material: selectWallpaper or Paint, prepare for the next oil job

07 ) Paint

Construction period: 15~20 days

Main material: You can start selecting at this stageLamps, Curtain and other software

08 ) Cabinet, kitchenware, toilet ware installation

Construction period: 2 to 3 days for cabinets and kitchen utensils; 1 day for interior doors; 1 day for toilet sanitary ware

09 ) Wood floor installation

Construction period: 1 to 2 days

Soft furnishings completed

01 ) Soft decoration

Construction period: 1 to 3 months (including the time spent selecting furniture)

02 ) Cleaning

Construction period: 2 to 4 days

03 ) Whole house acceptance

Duration: 1 day

The above is a summary of the decoration process A condensed version, followed by detailed explanations of each stage. You may wish to save it and read it slowly for the next explosion of knowledge!

Preliminary design

01 Find a designer

Get information from the Internet, home furnishing magazines and books, compile a list of favorite designers, and outline your needs for designers:Decoration budget, Style preference, Design quality, Careful attitude, evaluation and so on, and then meet with the designer to see if it meets your needs.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

02 Room Measurement

After confirming the design company, proceed to the on-site measurement. The designer will personally go to the site to record the space size, apartment type, and other matters that need attention.

If it is designed in a different place, you need to measure the room yourself.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Design planning

The designer follows the house type and lifestyle Once the requirements are met, the conceptual plan will be started and the design drawings will be finalized.

This is because different design solutions will affect the number of construction projects and the difficulty of the construction method, such as how much electricity is needed? How many sockets are needed? How much does it cost to lay the floor with marble or wooden flooring? The time and cost are also different.

Only after these are confirmed clearly, no temporary changes will be made during construction to avoid spending money on rework and wasting time.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

04 Select the construction team

Please hire a designerIn some cases, you can find a construction team that cooperates with the designer. If not, you have to find it yourself. You can first choose from the ones recommended by acquaintances.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

05 Material Purchasing

Main material:You must start purchasing floor heating, air conditioning, fresh air systems, doors and windows at this time, which will involve the configuration of water, electricity and external doors and windows

After the design is finalized, start purchasing the main materials. It is recommended to purchase them in the order of construction. Water, electricity and air conditioning projects will be constructed first, soWire, Air conditioner, Heating system, Fresh air system etc. need to be booked in advance before they can be connected to the site.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Jinyan Interior Design

And the externaldoor, windows are old and need to be replaced, in order to make the construction safer and to provide shelter from wind and rain , external doors and windows should also be purchased first, and they can be replaced at the beginning of construction.

Hardware construction

01 disassembly

Knock out walls, tiles, floors or home appliances, etc. The number of days for demolition and modification is related to the newness of the house and the demolition project.

Group room:3 days

Old House:About 7 days

Basic houses require less changes, and the main project is to demolish walls; while old houses usually have a lot of changes, and the walls, floors, ceilings, and even old equipment will be replaced together. If there are too many projects, the cost will increase. The time is also longer.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Image source/Kim Studio

02 Build wall

Wall construction is mostly done by adding wooden partitions for bedrooms and dressing rooms. If your bathroom or kitchen is to be demolished or renovated, the brick walls will also be laid at this stage before proceeding to the next stage of construction.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Install water and electricity

Main material:Toilet sanitary ware, Kitchen gas stoveRange hood,Customized cabinet, determined approximately 7 to 10 days before hydropower comes into the site

Generally speaking, the total area of ​​an exterior wall is about 100 square meters, and it takes about 10 days of construction. If your home is larger, about 200 square meters, it will take 20 days of construction.

Locate water and electricity lines on the wall or floor, then groove and lay waterPipes and electrical conduits, installation of socket boxes.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

At the water and electricity stage, you need to purchase kitchen and bathroom equipment first. You don’t need to go in first to order, just understand the size.

  • Kitchen:Gas stove, range hood
  • Bathroom:Toilet, bathtub, washbasin

After confirming the toilet, you can know whether the size of the fecal pipe aperture is consistent. Different toilets have different apertures, and they can be modified on site.

Customized cabinets and wardrobes also need to be matched with water pipes and circuits, which need to be confirmed before the water and electricity enter the site.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

04 Air conditioning, floor heating, and fresh air system installation

The air conditioner and fresh air system can be installed in 1 to 2 days. The floor heating installation will take longer and requires watering and maintenance. If you also need to install a water purifier and garbage disposal, it will also be installed at this time.

Usually, different manufacturers carry out construction in batches, and the overall calculation takes about 6 days.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Jinyan Interior Design

The installed fresh air system must first be installed with Plastic bag packaging to prevent dust from entering the equipment during construction and affecting operating efficiency.

05 Mason

Main material:Marbleortile, before the masons enter the site7 to 10 daysBuy well. Wooden floorDoor piece, Suspended ceilingIt needs to be determined at this time, which usually takes 2 weeks to 1 monthCustomized woodwork to prepare for the next project

This stage includes all the works that will use cement: leveling the floor, installing thresholds in the bathroom, waterproofing the kitchen and bathroom, and finally tiling.

Cement mortar needs a certain drying time to ensure the quality of the tiles, so it is normal to take three to four weeks.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

At this time, you can start to reserve measurements for subsequent projects:

1. Carpentry:Measuring door and wood cabinet dimensions

2. Customized cabinets and wardrobes throughout the house

3. Wooden floor: If your home does not have floor tiles but wooden floors, it is also recommended to start purchasing wooden floors at this time and ask the merchant to measure them.

Additionally, carpenters mainly make cabinets, room doors or special-shaped wooden ceilings. The laying of wooden floors is mostly left to merchants who sell wooden floors.

06 Woodwork

Main material:SelectWallpaperorPaint, prepare for the next oil workers

This stage is mainly about making cabinets, making doors, ceilings and wall decorations .

The carpenter will conduct a second retest and determine the size of the wooden door according to the height of the floor after the tiles are laid. The more cabinets and wall decorations you do, the longer the construction will take.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Kim Studio

07 Paint

Main material:SelectLampsCurtains and other software.

Don’t think that painting is just about painting the walls. In fact, all woodworking projects are Needs paint for finishing touch.

The ceiling and walls need to be leveled by oil workers,Cabinet, Door span>、WainscotingThe surface veneer of these customized furniture must be painted with protective paint to enhance color fixation.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

08 Cabinet, kitchenware, toilet ware installation

At the end of the painting project, the installation of some main materials can begin. It is recommended to install the kitchen cabinets, range hoods, and stoves first.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

The next step is to install the interior door, and the bathroom bathtub, showerhead, and washbasin can be installed in one day.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

09 Wood floor installation

Wooden floors usually don’t take much time and can usually be completed in one day. If there is a floor installation, it is also done at this time. At this time, the construction is mostly carried out by wooden floor manufacturers , rather than traditional carpentry.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Soft furnishings completed

01 soft decoration

Some homeowners are very particular about furniture, and it will take them one or two months just to choose the furniture. In this case, it is recommended to at least select and install it firstLamps, Curtains, make sure the lights are bright and powered, and the curtains have the functions of shading and protecting privacy.

Sofas, dining tables, chairs and other other furniture should wait until the details are cleaned before moving in, so that they will not be stained with dust.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Image source/Kim Studio

02 Cleaning

When it is handed over to the designer for half or full package, the design company usually attachesRough cleaningRemove large waste and cartons span>、It will take about one to two days to clean the dust and mud stains on the floor.

The homeowner needs to hire a professional cleaning company to perform comprehensive detailed cleaning, such as cleaning the dust accumulated in the window grooves, removing the shelves and drawers in the cabinets one by one, etc.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Whole house acceptance

Homeowners, designers, and supervision units conduct a comprehensive acceptance inspection. At this time, they should carefully check whether there is electricity, water, or any defects on the wall.

In fact, from the moment construction begins, the supervision unit can assist the homeowner to conduct inspection and acceptance after the completion of each project. After the acceptance is completed, the next project can be carried out. Only by ensuring that each link is truly inspected can it be effective. Avoid rework issues.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Professional Consulting/Kim Studio Design Director Jin Yan

Good article recommendations

I can’t bear it anymore! Japanese housewives open up the space under the stove and sink, doubling the kitchen storage, which is really practical

Japanese housewives’ tips for cleaning kitchen appliances! Microwave ovens and ovens can be cleaned in this way, and they can quickly remove stains without touching your hands

#decoration flow# #interior design # #Home Design # # Furniture # #Decoration Design #

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年1月16日
Next 2025年1月16日

相关推荐

  • 房地产放开限购 家居业走出低迷?

    作为房地产重要的下游产业,家居行业最近迎来了振奋人心的好消息——多个城市放开房地产限购政策,沉寂已久的房地产市场迎来销售热潮。放开限购政策不仅为房地产行业注入了新的活力,同时也将极大地激发下游家居市场的消费需求。而对家居企业来说,面对这一重要的新政,需要积极应对变化,抓住机遇,打开市场新空间。 各地纷纷放开房地产限购 进入五月,房地产政策出现了大转变,许多地…

    门业资讯 2024年5月20日
    50
  • 36岁赵丽颖晒出“家居生活”:一人独居,无拘无束,治愈了很多人

    2024年,娱乐圈掀起了一股赵丽颖的热潮,而这位备受瞩目的女演员也在私底下展现了自己的生活态度和哲学观。她的一举一动都备受关注,无论是在银幕上的形象还是在日常生活中的点滴。那么,除了镜头下的光鲜亮丽,赵丽颖私底下的生活又是怎样的呢?让我们一起来看看。 **一人独居:** 赵丽颖的生活并不全是红毯和镁光灯,她也有着普通人的生活状态。在没有工作的时候,她宅在家里…

    门业资讯 2024年4月30日
    80
  • 8个颜值高还便宜的家居小件,用过后就再也戒不掉了,太实用了

    你家里有哪些让自己引以为傲的家居小物呢?我家的一些小件家居产物,真是让我觉得颜值又高又便宜实用,确实值得买。 今天,我就和各位小伙伴分享一下我家的这些家居小件,说句大言不惭的话,有时候我自己都会对着镜子跟自己说一句“你怎么这么会买呢”! 一、零食小推车 相信很多人对零食小推车的印象,都停留在那种普通造型的架子,但实际上,我个人感觉这种两层的零食小推车用起来更…

    门业资讯 2024年3月5日
    120
  • 这7个小家电,“曾经有多火,如今就有多嫌弃”!我全都给扔了

    文/家居杂坛 居家过日子,对于大多数人来说,大都离不开一些小家电。 小家电的种类非常多,也曾经非常火爆! 可是,有些小家电,买的时候啊,确实很火爆。但是,用一段时间,就感觉很不好用,就被闲置了,最后放在家里吃灰。 下面要给大家介绍的6种小家电:曾经有多火爆,目前就有多被嫌弃! 这些可不是我胡说,都是居家过日子过出来的一些生活的经验。 本期分享:小家电的选择。…

    门业资讯 2024年2月27日
    20
  •  Dance drama \”The Door\” at the National Center for the Performing Arts

     <strongstyle=\"outline:0px; font-family:system-ui,-apple-system,BlinkMacSystemFont,\"HelveticaNeue\",\"PingFangSC\",\"HiraginoSansGB\",\&quo…

    门业资讯 2024年8月26日
    60

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信