The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Those who are planning to start a renovation probably don’t know how to start

There are too many details to worry about when decorating, when to buy materials and how to proceed Oversight

This is so heartbreaking

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Here is a complete decoration process for everyone

Follow the pictures step by step and take you step by step

Gives you a method for decoration, just copy the homework according to the table and it will be done!

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/E.Ma Interior design

Decoration process

Preliminary design

01 ) Find a designer

Construction period: 1 to 2 months

02 ) Measurement

Construction period: 1 day

03 ) Design planning

Construction period: 2 to 3 months

04 ) Find a construction team

Construction period: 14~21 days

05 ) Material procurement

Construction period: 1 day

Main material:Floor heating, Air conditioner, Fresh air system, Doors and windows, it is recommended to start purchasing after the design proposal is completed

Hardware construction

01 ) Dismantle and modify

Construction period: 3 to 7 days

02) Build a wall

Construction period: 7 days

03 ) Water and electricity

Construction period: 10~20 days

Main material:Toilet sanitary ware, Kitchen gas stove, Range hood, Customized cabinet, make an appointment before the water and electricity comes in7 to 10 daysConfirm

04 ) Air conditioning, floor heating, and fresh air system installation

Construction period: 5 to 6 days

05 ) Mason

Construction period: 21 to 28 days

Main material:Marble or Tile , purchase it 7 to 10 days before the masons enter the site. Wood floor, Door panel, Suspended ceiling must be determined at this time, which usually takes 2Customized every week to one month

06 ) Woodwork

Construction period: 1 to 1.5 months

Main material: selectWallpaper or Paint, prepare for the next oil job

07 ) Paint

Construction period: 15~20 days

Main material: You can start selecting at this stageLamps, Curtain and other software

08 ) Cabinet, kitchenware, toilet ware installation

Construction period: 2 to 3 days for cabinets and kitchen utensils; 1 day for interior doors; 1 day for toilet sanitary ware

09 ) Wood floor installation

Construction period: 1 to 2 days

Soft furnishings completed

01 ) Soft decoration

Construction period: 1 to 3 months (including the time spent selecting furniture)

02 ) Cleaning

Construction period: 2 to 4 days

03 ) Whole house acceptance

Duration: 1 day

The above is a summary of the decoration process A condensed version, followed by detailed explanations of each stage. You may wish to save it and read it slowly for the next explosion of knowledge!

Preliminary design

01 Find a designer

Get information from the Internet, home furnishing magazines and books, compile a list of favorite designers, and outline your needs for designers:Decoration budget, Style preference, Design quality, Careful attitude, evaluation and so on, and then meet with the designer to see if it meets your needs.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

02 Room Measurement

After confirming the design company, proceed to the on-site measurement. The designer will personally go to the site to record the space size, apartment type, and other matters that need attention.

If it is designed in a different place, you need to measure the room yourself.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Design planning

The designer follows the house type and lifestyle Once the requirements are met, the conceptual plan will be started and the design drawings will be finalized.

This is because different design solutions will affect the number of construction projects and the difficulty of the construction method, such as how much electricity is needed? How many sockets are needed? How much does it cost to lay the floor with marble or wooden flooring? The time and cost are also different.

Only after these are confirmed clearly, no temporary changes will be made during construction to avoid spending money on rework and wasting time.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

04 Select the construction team

Please hire a designerIn some cases, you can find a construction team that cooperates with the designer. If not, you have to find it yourself. You can first choose from the ones recommended by acquaintances.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

05 Material Purchasing

Main material:You must start purchasing floor heating, air conditioning, fresh air systems, doors and windows at this time, which will involve the configuration of water, electricity and external doors and windows

After the design is finalized, start purchasing the main materials. It is recommended to purchase them in the order of construction. Water, electricity and air conditioning projects will be constructed first, soWire, Air conditioner, Heating system, Fresh air system etc. need to be booked in advance before they can be connected to the site.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Jinyan Interior Design

And the externaldoor, windows are old and need to be replaced, in order to make the construction safer and to provide shelter from wind and rain , external doors and windows should also be purchased first, and they can be replaced at the beginning of construction.

Hardware construction

01 disassembly

Knock out walls, tiles, floors or home appliances, etc. The number of days for demolition and modification is related to the newness of the house and the demolition project.

Group room:3 days

Old House:About 7 days

Basic houses require less changes, and the main project is to demolish walls; while old houses usually have a lot of changes, and the walls, floors, ceilings, and even old equipment will be replaced together. If there are too many projects, the cost will increase. The time is also longer.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Image source/Kim Studio

02 Build wall

Wall construction is mostly done by adding wooden partitions for bedrooms and dressing rooms. If your bathroom or kitchen is to be demolished or renovated, the brick walls will also be laid at this stage before proceeding to the next stage of construction.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Install water and electricity

Main material:Toilet sanitary ware, Kitchen gas stoveRange hood,Customized cabinet, determined approximately 7 to 10 days before hydropower comes into the site

Generally speaking, the total area of ​​an exterior wall is about 100 square meters, and it takes about 10 days of construction. If your home is larger, about 200 square meters, it will take 20 days of construction.

Locate water and electricity lines on the wall or floor, then groove and lay waterPipes and electrical conduits, installation of socket boxes.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

At the water and electricity stage, you need to purchase kitchen and bathroom equipment first. You don’t need to go in first to order, just understand the size.

  • Kitchen:Gas stove, range hood
  • Bathroom:Toilet, bathtub, washbasin

After confirming the toilet, you can know whether the size of the fecal pipe aperture is consistent. Different toilets have different apertures, and they can be modified on site.

Customized cabinets and wardrobes also need to be matched with water pipes and circuits, which need to be confirmed before the water and electricity enter the site.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

04 Air conditioning, floor heating, and fresh air system installation

The air conditioner and fresh air system can be installed in 1 to 2 days. The floor heating installation will take longer and requires watering and maintenance. If you also need to install a water purifier and garbage disposal, it will also be installed at this time.

Usually, different manufacturers carry out construction in batches, and the overall calculation takes about 6 days.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Jinyan Interior Design

The installed fresh air system must first be installed with Plastic bag packaging to prevent dust from entering the equipment during construction and affecting operating efficiency.

05 Mason

Main material:Marbleortile, before the masons enter the site7 to 10 daysBuy well. Wooden floorDoor piece, Suspended ceilingIt needs to be determined at this time, which usually takes 2 weeks to 1 monthCustomized woodwork to prepare for the next project

This stage includes all the works that will use cement: leveling the floor, installing thresholds in the bathroom, waterproofing the kitchen and bathroom, and finally tiling.

Cement mortar needs a certain drying time to ensure the quality of the tiles, so it is normal to take three to four weeks.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

At this time, you can start to reserve measurements for subsequent projects:

1. Carpentry:Measuring door and wood cabinet dimensions

2. Customized cabinets and wardrobes throughout the house

3. Wooden floor: If your home does not have floor tiles but wooden floors, it is also recommended to start purchasing wooden floors at this time and ask the merchant to measure them.

Additionally, carpenters mainly make cabinets, room doors or special-shaped wooden ceilings. The laying of wooden floors is mostly left to merchants who sell wooden floors.

06 Woodwork

Main material:SelectWallpaperorPaint, prepare for the next oil workers

This stage is mainly about making cabinets, making doors, ceilings and wall decorations .

The carpenter will conduct a second retest and determine the size of the wooden door according to the height of the floor after the tiles are laid. The more cabinets and wall decorations you do, the longer the construction will take.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Picture source/Kim Studio

07 Paint

Main material:SelectLampsCurtains and other software.

Don’t think that painting is just about painting the walls. In fact, all woodworking projects are Needs paint for finishing touch.

The ceiling and walls need to be leveled by oil workers,Cabinet, Door span>、WainscotingThe surface veneer of these customized furniture must be painted with protective paint to enhance color fixation.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

08 Cabinet, kitchenware, toilet ware installation

At the end of the painting project, the installation of some main materials can begin. It is recommended to install the kitchen cabinets, range hoods, and stoves first.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

The next step is to install the interior door, and the bathroom bathtub, showerhead, and washbasin can be installed in one day.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

09 Wood floor installation

Wooden floors usually don’t take much time and can usually be completed in one day. If there is a floor installation, it is also done at this time. At this time, the construction is mostly carried out by wooden floor manufacturers , rather than traditional carpentry.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Soft furnishings completed

01 soft decoration

Some homeowners are very particular about furniture, and it will take them one or two months just to choose the furniture. In this case, it is recommended to at least select and install it firstLamps, Curtains, make sure the lights are bright and powered, and the curtains have the functions of shading and protecting privacy.

Sofas, dining tables, chairs and other other furniture should wait until the details are cleaned before moving in, so that they will not be stained with dust.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

▲ Image source/Kim Studio

02 Cleaning

When it is handed over to the designer for half or full package, the design company usually attachesRough cleaningRemove large waste and cartons span>、It will take about one to two days to clean the dust and mud stains on the floor.

The homeowner needs to hire a professional cleaning company to perform comprehensive detailed cleaning, such as cleaning the dust accumulated in the window grooves, removing the shelves and drawers in the cabinets one by one, etc.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

03 Whole house acceptance

Homeowners, designers, and supervision units conduct a comprehensive acceptance inspection. At this time, they should carefully check whether there is electricity, water, or any defects on the wall.

In fact, from the moment construction begins, the supervision unit can assist the homeowner to conduct inspection and acceptance after the completion of each project. After the acceptance is completed, the next project can be carried out. Only by ensuring that each link is truly inspected can it be effective. Avoid rework issues.

The designer has summarized the most complete decoration process. He has read it before installation to ensure that he will not make any mistakes. No wonder he has collected over 10,000 pieces.

Professional Consulting/Kim Studio Design Director Jin Yan

Good article recommendations

I can’t bear it anymore! Japanese housewives open up the space under the stove and sink, doubling the kitchen storage, which is really practical

Japanese housewives’ tips for cleaning kitchen appliances! Microwave ovens and ovens can be cleaned in this way, and they can quickly remove stains without touching your hands

#decoration flow# #interior design # #Home Design # # Furniture # #Decoration Design #

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

Like (0)
华夏门网的头像华夏门网
Previous 2025年1月16日
Next 2025年1月16日

相关推荐

  • 让人“买得起却用不起”的8样家居产物,你买过几个?

    在现代社会,生活质量的提升和消费水平的不断增长,促使人们对家居用品的要求越来越高。然而,有些家居产品虽然价格不菲,购买时令人心动,但在实际使用过程中却往往让人感到“买得起却用不起”。下面就来细数八种这样的家居产品,看看你是否也曾为它们感到困扰。 高档智能马桶智能马桶在广告中的展示总是那么令人向往,自动加热座圈、温水清洗、暖风干燥功能样样俱全。然而,真正把它安…

    门业资讯 2024年10月9日
    40
  • 现在流行什么样的家居?

    1,北欧风, 又叫做斯堪的纳维亚风,它指的是欧洲北部国家的艺术设计风格。很多人以为北欧风就是黑白灰,其实不然。它最讲究的其实是造型简单,以及强烈的纯色基调,而不是单纯的“性冷淡”。所以,北欧的家居在用色上也一直大胆鲜明。 2,低调有韵味的新中式 新中式的家居风格最近几年很火,它就像我们中华5000年文化的沉淀:既有唐代、明清时期家居理念的精华,又有现代的流行…

    门业资讯 2024年5月15日
    80
  • 为何越来越多人这么装柜子?看了广州这户人家的做法,被惊艳到了

    一个家,装修的再好,如果后期不会收纳,不会打理,也会越住越乱。 也正是由于这个原因,有很多人家里装了满屋的柜子。可是,柜子装不好,往往并不是太好用。 现在越来越多人这么安装柜子,你知道是为什么吗?看看广州这户人家的做法,你也会被惊艳到。 本期分享:柜子的新式的做法。 全文分成五大部分:侧面柜;门后薄柜;阳台多功能柜;厨房薄收纳柜;卫生间吊柜。 (一)— —侧…

    门业资讯 2024年11月1日
    60
  • 年轻人买车要帅,这3款剪刀门“跑车”值得考虑,最低仅售24万多

    对于许多想买车的年轻人来说,近些年国产车企所推出的可升降电动尾翼、四出排气好像已经满足不了他们的“胃口”。所以,车企们也就变着法儿地推出了更多吸引人眼球的配置,比如说剪刀门。 经常关注车的朋友就一定知道,剪刀门在以前几乎都是超跑的标配,像什么兰博基尼、迈凯伦,就都有推出过配备剪刀门的超级跑车。也正是因为剪刀门经常出现在超跑身上,才引得无数年轻人为之所着迷。 …

    门业资讯 2023年10月5日
    980
  •  Dance drama \”The Door\” at the National Center for the Performing Arts

     <strongstyle=\"outline:0px; font-family:system-ui,-apple-system,BlinkMacSystemFont,\"HelveticaNeue\",\"PingFangSC\",\"HiraginoSansGB\",\&quo…

    门业资讯 2024年8月25日
    100

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信