The whole process of decorating a house

Spend 3 weeks to sort out a design for a novice who is decorating for the first time. With the complete decoration process and construction standards, a decoration novice can also become an experienced driver!

Click to get a free design plan

(A mini program has been added here, please go to the Toutiao client to view)

The full text contains 3000+ practical information, starting from the pre-decoration preparation to the construction focus of each decoration link, the installation of main materials, and material preparation, we will teach you how to decorate step by step!

The whole process of decorating a house

1. Decoration preparation stage

1. How much does it cost to decorate?

The same house can be installed with 100,000 yuan or 1 million yuan. If you want not to overspend, you must learn to make a budget.

Generally, 20% is reserved in the total budget to ensure that subsequent renovations will not exceed the budget due to various additions.

The next budget is mainly divided into hard decoration and semi-package, main materials, home appliances, and soft decoration Four parts, the reference distribution ratio is hard decoration: furniture and home appliances: soft decoration 4:4:2 (generally the main material budget table for hard decoration will be provided by decoration companies)

The first step is to list the project materials of each link in order, and the second step is to fill in the found market price into the form:

The whole process of decorating a house

Right first For novices who are renovating for the first time, it is difficult to make a detailed budget table in one go.Just take the average local decoration quotation as a reference.

2. Who can I find to help with decoration? ?

Before answering this question, First, we need to understand the current three decoration methods:

Clear package:Buy all the main and auxiliary materials yourself, workers Just work. If you are a novice decorating for the first time, choose carefully!

Half pack :Buy the main materials yourself, and the construction party will be responsible for the auxiliary materials. It is cost-effective and is the choice of most people.

All inclusive:Main materials, auxiliary materials, and workers are all handled by the construction party. It’s an option if you have enough budget but don’t have the time and energy.

After determining the decoration method, you can then decide to find someone to help with the decoration. The construction team can be roughly divided into three types:

Individual foreman:Suitable for clear bags and half bags, theoretically It is about 10% cheaper than the decoration company, because there is no management fee, but basically no contract binding, no after-sales service,Only recommended for very qualified people to choose a personal foreman.

Independent designer:Suitable for clear packages and half packages. In addition to design drawings, design studios in big cities such as Beijing, Shanghai, Guangzhou, Shenzhen and Chengdu are also responsible for construction. It is somewhat integrated with design and construction, which can make it more precise. It is easy to realize the design effect and is not easy to overturn. The disadvantage is that in addition to the construction fee, there is an additional design fee of 200-2000/㎡.If you have sufficient budget and have high requirements for design and style, you can choose an independent designer.

Decoration company:Suitable for half-package or full-package, complete decoration services from design, construction, quality inspection, etc. It is recommended to choose the local one as much as possibleDecoration companies that are larger in scale and have been established for a longer time should avoid small workshops.

3. What decoration materials should I buy? ?

After determining the construction method, You can also roughly determine the materials you want to buy. During the entire decoration process, the materials to be used are:

① Main material: Floors, ceramic tiles, wallpapers, wall coverings, suspended ceilings, stone, sanitary ware, cabinets, water heaters, faucets, showerheads, sinks, water purifiers, range hoods, stoves, doors, lamps, switches, sockets, hardware pieces etc.

② Auxiliary materials: span>Cement, sand, bricks, keels, waterproof materials, plumbing fittings, wires, putty, glue, wood paint, latex paint, thermal insulation and sound insulation materials, floor drains, angle valves, soft connections, etc.

Clear the package and buy everything yourself For the main materials and auxiliary materials, you only need to buy the main materials for the half package, and the auxiliary materials are purchased by the construction party. For the full package, you don’t need to buy the materials.

The whole process of decorating a house

The following materials, Except for the free part of the all-inclusive package, under normal circumstances, you need to buy it yourself:

③ Large equipment:Fresh air, For central air conditioning, whole-house water supply equipment, floor heating, etc., it is necessary to decide whether to install them before the renovation, and decide after the construction starts, which may delay the construction period.

④ Soft decoration: Although furniture, home appliances, green plants, hanging paintings, ornaments, etc. are installed at the last step, the dimensions must be confirmed in the early stage of decoration, especially kitchen appliances, otherwise there will be no way to reserve switches and sockets.

The following are common reference brands and prices of main and auxiliary materials for reference:

The whole process of decorating a house

The whole process of decorating a house

Decoration construction The links are: demolition – water and electricity – bricklayer – carpentry – oiler – installation, which is often called water, electricity, mud, wood and oil

Click to get a free design plan

(A mini program has been added here, please go to the Toutiao client to view)

2. Disassembly and modification

Construction Points

1) Remove unnecessary walls, Note that load-bearing walls cannot be demolished. The most direct way to determine whether it is a load-bearing wall is to look at the construction drawings. Generally, the black part in the picture represents the load-bearing structure, the rest represents the brick or concrete wall, and the dotted lines represent the beams.

The whole process of decorating a house

2) Dismantling Wall and ceiling topcoat, that is, shovel white. Use a spatula to remove the paint from top to bottom, left to right, until the cement layer is exposed until.

The whole process of decorating a house

3) Newly build a partition wall, with the top layer built diagonally with small bricks Centipede Foot, in the middle ishorse tooth rub style, use no less than 3 layers at the bottomSmall bricks for floor pillows.

The whole process of decorating a house

Inside the junction of the old and new walls, steel bars should be implanted every 60cm. A steel mesh with a width of not less than 15cm needs to be laid outside the junction of the walls to increase the stability of the old and new walls.

The whole process of decorating a house

4) Finished product Protection: Protective films should be applied to the floor and walls from the elevator entrance to the entrance door. Protective covers or covers should be used on sewer pipes, floor drains, gas meters, and wire boxes.

The whole process of decorating a house

2. The owner needs to make the following preparations:

After the demolition and modification are completed, you can make an appointment with the merchant to come and measure:

1) The first time I came to measure the cabinets and help with drawings for the kitchen\’s plumbing renovation.

2) Central air conditioning, fresh air, floor heating, Central water purification system: Determine the point location, pipeline layout, drilling location, and ceiling plan.

3) Door: The merchant comes to determine the floor height , determine the specific quantity and size.

4) Window: Determine the height of the window opening, specifically Quantity and size.

3. Hydropower transformation

1. Early preparation

1) Make an appointment to collect cabinets, central air conditioners, floor heating, fresh air, central water purification and other businesses, and confirm the water and electricity points, pipeline layout, etc. with plumbers.

2) Confirm the embedded sanitary ware (into the wall) showerheads, faucets, wall-mounted toilets)

3) Confirm the location and quantity of ceiling chandeliers, downlights, and spotlights

4) Confirm whether to use an electric water heater or a gas water heater, as well as the size and specifications of the water heater

2. Construction Focus

1) Water and electricity positioning: Determine the circuit points such as switches, sockets, lamps, and weak points, as well as the waterway points such as water supply pipes, floor drains, faucets, etc., mark the location and height of the points on the wall, and estimate the water and electricity accessories. Quantity, and price of water and electricity renovation.

2) Draw lines and groove: use a level The Hemo line pops up the specific circuit and waterway direction. The depth of the waterway groove is about 25cm, and the circuit groove does not exceed 50cm.

3) Pipe laying: different channels for water and electricity, Different slots for hot and cold water pipes, and different slots for strong and weak wires

The whole process of decorating a house

3. Basic height reference for water and electricity points:

1) Washbasin faucet height: 800-1000mm

2) Washing machine faucet height: 1200mm

3) Shower height: 2000 – 2200mm

4) Water heater inlet height: 1700mm

5) Socket height: 400mm

6) Switch height: 1200 – 1400cm

7) Height of hanging air conditioner: 18900mm

4. Installation of main materials:

1) Fresh air/central air conditioning host and floor heating, water purification system

2) Pre-embedded Type sanitary ware, such as installing faucets, showers, etc.

5. Prepare the main materials for the next step of construction:

1) Purchase ceramic tiles, window sill stones, threshold stones, shower room retaining strips, and floor drains, and deliver them to the site before the bricklayers come in

2) Customized anti-theft windows are delivered to the site before the bricklayers enter the site

Four. Bricklayering

1. Construction points:

1) Bathroom waterproofing:Ordinary wall waterproofing height is 30cm. The waterproofing height of the wall with a shower room is generally 180cm. The waterproofing height of the wall with a bathtub and adjacent to the bathtub should be higher than the bathtub. 30cm; the wall in the bathroom that is in contact with the washbasin needs to be 30cm above the washbasin.

2) Closed water test:Do a closed water test 24 hours after the waterproofing is completed. Fill the bathroom with 2cm of water and observe for 24 to 48 hours. Remember to notify the residents downstairs and check with the property management to see if the water level has dropped significantly, on the wall next door or downstairs. Are there any traces of water seepage at the corresponding location? If everything is normal, it proves that the waterproofing is done well and the inspection is passed.

The whole process of decorating a house

3) Cover the riser: Before wrapping the sewer pipes, instruct the workers to wrap them with sound insulation cotton or gold damping to prevent the flushing sound from your neighbors from reaching your home. After wrapping the risers with bricks, Hung a layer of barbed wire, and then lay the tiles. In addition, remember to leave an access opening.

The whole process of decorating a house

4) Laying tiles: Before laying ceramic tiles, it is necessary to pre-arrange according to the drawings. It is agreed that there cannot be more than one row of non-solid tiles on one wall. The non-solid tiles should be in secondary positions or in the dark corners. Remember to look for ceramic tiles on the bathroom floor. Slope, put the floor drain at the lowest outlet to drain water. : #A3A3A3;\”>2. Main material installation:

1) Install anti-theft windows before laying bricks to facilitate the tiler to close them

2) The security door can be installed as soon as the bricklayer comes in, and the master bricklayer can correct the ground height difference.

3. Prepare the main construction materials for the next step:

1) After laying the tiles, contact the whole house customization and interior door merchants to come and measure

2) Order wooden floors and baseboards

5. Carpentry

1. Construction points

1) According to the general carpentry sequence, the first carpentry construction is to erect the ceiling keels and seal them with gypsum boards.

2) Curtain boxes and ceilings can be installed simultaneously For installation, if there is no suspended ceiling at home, you can also ask the carpenter to make a baffle directly.

3) If you want to lay wooden floors, then The ground needs to be leveled with cement mortar, otherwise it will squeak when you walk on it after installation.

The whole process of decorating a house

2. Install main materials

1) Cabinets made at the carpentry site are installed at this stage. If they are customized cabinets, they will be installed by the merchant later.

2) Install the invisible door made by carpenters, and the indoor finished door will be installed later.

3. Prepare the main materials for the next step of construction:

1) Purchase latex paint and wallpaper

2) Make an appointment for door-to-door installation of customized cabinets and indoor doors

Click to get a free design plan

(A mini program has been added here, please Go to Toutiao client to view)

6. Oil industry link

1. Construction points

1) Protection of finished products. Cabinets and furniture that do not need to be painted must be protected before painting to avoid staining the furniture.

2) Scrape the putty, clean and level the wall before painting, and remove the potholes Touch it up and smooth the front to increase the adhesion of exterior paint or wall coverings

3) Wall coating treatment. After the base layer of the wall is processed, use latex paint to paint the outermost layer of topcoat, or use wall cloth for paving.

The whole process of decorating a house

2. Main material installation:

1) When installing cabinets, make an appointment in advance for the hood, stove and sink. It is best to deliver them on the same day and install them together with the cabinets.

2) The indoor door can be installed in front of the floor, mainly because the door installation steps are complicated, including hinges, door locks, door catches, door frames, etc., and many tools are used , install the interior door first to avoid damaging the wooden floor.

3) Install wooden floors and baseboards.

4) Install customized cabinets such as shoe cabinets and wardrobes

3. Prepare the main materials for the next step of construction:

1) Purchase switches, sockets, and lamps

2) Purchase sanitary ware that you are optimistic about in advance

3) Furniture and electrical appliances can be ordered

4) Make an appointment with an electrician to install switches and sockets

Seven. Installation Phase

1. Kitchen and bathroom integrated ceilingInstallation

If the construction period is not tight, you can wait for the painting to be completed Do it well, it\’s more hygienic. Install the water heater and bathroom heater first. After installation, the edge sealing of the ceiling can better half-enclose the water heater, which means the connection will be more beautiful.

The whole process of decorating a house

3. Switch Socket installation

The water and electricity stage has been reserved. This step is the last step. Connect the wires and install the panels.

4. Lighting installation

The wires of the lamps have been left in the water and electricity stage. At this stage, the lamps can be directly installed and powered on for testing.

5. Toilet installation

Toilet installation is relatively easy, and most merchants are responsible for the installation.

6. Hardware installation (1 day)

Install hardware such as clothes drying racks, curtain rods, lamps, sanitary ware, and bathroom fixtures. It is also recommended that these dust-laden items be dealt with one by one before installing the floor.

7. Touch up paint after installation

In the installation stage, there are many steps and there are many people. It is easy to bump into the corners and damage the paint surface. At this time, the painter can repair the problematic areas and bring a perfect end to the overall hard decoration.

8. Land reclamation and cleaning

After the hard decoration is completed, land reclamation and cleaning should be carried out before the furniture and appliances are brought into the site. It is best to complete it before the curtains are installed.

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2025年1月4日 09:14:59
下一篇 2025年1月4日 09:17:55

相关推荐

  • “我要家居,不是家具”——广东夫妇的装修理念,值得所有人借鉴

    这个《98㎡现代奶油风,简单有温度,满屋幸福感》的家,屋主从简的生活态度,真值得大家学习~ 分享一个原创作品,房子在广东惠州,面积大概98平,喜欢简单温馨的空间感。他说——房子不单单是一个钢筋混凝土的结构物,而是一个融合了各种元素的温馨的家,日常的“衣食住行玩”,均要围绕它进行,一个好的家居环境会对家庭成员带来幸福感和安全感的提升。 屋主抱着“家居不该是简单…

    门业资讯 2024年12月7日
    280
  • Xiamen Haicang: Strive to realize conflicts and disputes by \”entering one door and solving all kinds of problems\”

    Recently, Ms. Yang, who lives in Dongfuzhaihou Village, Haicang District, Xiamen City, is planning to put her house that has been idle for a long time online for rent again. Before…

    门业资讯 2024年12月10日
    60
  • 中泰证券:家居以旧换新持续落地 需求改善可期

    中泰证券研报指出,以旧换新持续落地中,有望改善家电需求及行业格局。以旧换新补贴持续落地中,本轮家装补贴落地速度慢于家电,主要由于:1)家装此前并未充分享受补贴,具体落地方案需重新制定;2)家居行业集中度较低、且小商较多,资质审核难度更高。随着补贴逐步落地,判断四季度家居需求将边际改善,同时由于补贴需要经销商垫资等因素,判断大品牌、大经销商受益程度更高,行业竞…

    门业资讯 2024年10月19日
    170
  • 家电怎么选不踩雷?这3款家电轻松拿捏家居生活幸福感

    经常看见网友吐槽挑家电难,也是,现在各大厂商为了更好争取消费者的青睐,不断推陈出新,根据不同人群的需求带来不同的细分产品。今天就给大家安利三款闭眼可入的家电产品,给大家一点参考,希望大家都能找到合适自己的家电。 TCL超薄零嵌冰箱T9 冰箱绝对算是家家必备的家电了,而嵌入式冰箱凭借节省空间又美观的优势,成为当下家电的潮流新选择。 TCL的超薄零嵌冰箱T9采用…

    门业资讯 2023年12月8日
    50
  • 教你打造温馨舒适的家居空间,让你爱上家!

    亲爱的朋友们,一个温馨舒适的家,是每个人都渴望拥有的。作为一个资深的家居博主,我今天想和大家分享几点打造温馨家居的小技巧。相信采纳这些建议后,你一定能给家里添上更多的暖色调,营造出一个让人心旷神怡的居家环境。 首先,选择适当的家居色彩。温暖的黄色、浅绿或浅蓝色的家居色,能给人带来舒适安心的感觉。其次要注意家居装修的细节,比如墙面可以贴上一些亲和力很强的壁纸,…

    门业资讯 2024年1月27日
    430

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信