In the decoration process, additions are common phenomena, but they are also one of the most likely places for business owners to be cheated. Here are some common decoration additions and reasons, as well as suggestions on how to avoid these additions:
1. Common additions Items and reasons
1. Disassembly and modify the stage
- Wall removal and new construction: The fees for demolishing walls, doors, etc. were not clear in the early stage, and the fees will be charged one by one according to the project during construction.
- Garbage removal and material transportation: These fees are not included in the contract and will be collected separately in the later period.
2. Hydroelectric transformation stage
- Hydroelectric point increase: The water and electricity spots in the early reporting period are reported at a small amount, and the spots are added during actual construction and calculated according to the actual usage.
- Integrated items such as intelligent control modules: Not included in the initial quote, and it is recommended to increase during later construction.
3. Brickworking stage
- Wall surface processing : For example, the operation of woven surfaces and equality search is not included in the quote.
- Porcelain Brick Label: Including treatment of begonia corners, stone cutting, filling, etc., the price was not clearly reported in the early stage.
4. Carpentry and oil work stage
- Material selection: Top materials (light steel dragon bones and wooden square dragon bones), gypsum leveling, angular angular strip treatment, etc. may cause additional costs.
- Laser paint color adjustment fee: If special colors or high-end branded paint is required, additional expenses will be generated.
5. Waterproofing engineering
- Waterproof height increase: Report time The waterproof height is 1.2 meters, and it is recommended to increase it to 1.8 meters during actual construction.
- Waterproof area expands: For example, waterproof floor beams in the hygienic room are not included in the quote.
6. Whole house customization
- Additional design: For example, drawers, glass doors, rattan doors, leaf doors, light belts, etc. are not confirmed in the early quotes, and additional charges will be charged during later customization.
7.Other details
- Window table stone, door stone: These items are not included in the contract, and later installation time is charged separately.
- Kicking foot wires, lifting pipes: Not clearly included in the quote, additional charges are charged during later construction.
- Beauty Skills: After the porcelain tiles are pasted, it is recommended to use beauty Skills, which are not included in the quote.
2. How to avoid adding more
1. Clearly Terms of the contract
- Detailed price: Before signing a contract, the decoration company is required to provide detailed price lists to clarify the specific content of each item, Material brand and model.
- Increase restrictions: Add limited terms for addition to the contract. If the increase fee shall not exceed 5% or 10% of the total contract price, The excess is undertaken by the decoration company.
2. Understand the construction details
- hydroelectric transformation: Clearly determine the hydroelectric point Quantity and direction to avoid adding docks in the later stage.
- Waterproofing project: Clear the waterproofing height and area, and ensure that the price includes all necessary construction content.
- Waterproofing project: Clear the waterproofing height and area, and ensure that the price includes all necessary construction content. li>
3. Avoid malicious omissions
- Check the price list: Carefully check whether the price list contains items such as demolition and modification, garbage removal, window stones, kicking foot lines, etc.
- Confirm the material brand: Determine the material brand and model to avoid later material replacement resulting in increased items.
4. Reduce active increase
- Previous planning: Make detailed planning before decoration to avoid later aesthetics or functional needs Change the design plan.
- Contact clearly: Communicate fully with designers and construction teams to ensure that all needs are clearly confirmed before the contract is signed.
Using the above methods, you can effectively reduce the additions during the decoration process and avoid budget overspending. I hope this information can help you avoid unnecessary troubles and expenses during the decoration process.