Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Summer is here, the weather is sunny, and it is a good season for decoration! Recently, many owners have sent private messages to Feimojun, asking about many things about decoration. Without further ado, here is the whole house decoration process, take it away without any thanks!

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Preparation before decoration

Does decoration start with construction? No! Preparation in the early stage of decoration is also a very important part of decoration.

01 Confirm decoration needs

The first step in decoration is to confirm your decoration needs!

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Confirm the decoration needs include: How many people live there permanently? How many bedrooms are left? How many bathrooms are left? Whether there is any renovationRequire? Is there any space you wish to add through design? What style of decoration do you like? Ask yourself these questions first, list the results, and clarify your needs, so that you will not be confused about decoration!

02 Choose decoration method

After confirming your decoration needs, you need to choose the decoration method that suits you! There are three decoration methods: full package, clear package, and half package.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Full package: from design to construction to purchasing materials, the decoration company takes care of everything. The owner is responsible for paying and moving in; this is the most worry-free, but the owner will have less initiative in decoration. Suitable for owners who are completely time-poor.

Clear package: Completely opposite to full package, from design to construction to purchasing materials, everything is managed by the owner himself; time-consuming and labor-intensive, And the requirements for the owner’s own decoration experience are high.

Half package: between the first two, the decoration company is responsible for design + construction + auxiliary materials; the owner is responsible for purchasing the main materials Furniture and appliances; owners have the initiative to decorate, but they don’t have to worry too much, and they buy the main furniture and appliances themselves, so they don’t have to worry about the decoration company shoddy.

In general:

● Full package is suitable for owners who have no time to decorate;

● Clear package is suitable for owners who have time and decorateOwners with rich repair experience;

● Half package is suitable for most office workers who want to participate in decoration but don’t want to spend too much energy.

03 Find a decoration company

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Decoration company: an ordinary decoration company, popular decoration, quite satisfactory, and the cost is in the middle.

Design company: Customized design, the effect is more beautiful and practical, and will design and plan according to the needs of the owner; however, the design fee will cost more than Ordinary decoration companies are a bit higher.

Construction team: only responsible for construction, not design.

Road decoration team: only responsible for the construction of a certain type of work, without after-sales guarantee.

Not many suggestions, just choose according to your needs! In addition, you also need to make your own budget!

Hard decoration under construction

When everything is ready, we will enter the hard decoration construction stage!

01Demolition and reconstruction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Construction content: demolition of walls and new construction; demolition of original finely decorated second-hand houses decorate.

● Estimated construction period: 2-3 days for new rough houses, and about one week for second-hand houses/old houses/furnished houses.

● Construction precautions: All load-bearing walls, beams, public facilities, etc. cannot be demolished.

02 Water and electricity construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Preparation before decoration: need to confirm the location and size of all electrical appliances; confirm all switches The number of socket locations; central air conditioning and floor heating must be installed before water and electricity are started.

● Estimated construction period: 2-3 weeks. The larger the area, the longer it will take.

Designers will design the switches and sockets, so you basically don’t have to worry about them yourself; central air conditioners, etc. are also installed by merchants.

The most important thing we need to pay attention to is to confirm the size and position of all electrical appliances, because different products will definitely have different sizes. ; It is not necessary to buy it, but the most basic style must be confirmed.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Formal construction process: water and electricity disclosure → water and electricity estimate → material arrival → release Wire grooving→Strong and weak electric pipes→Water supply and drainage pipes→Strong electric box sorting→On-site cleaning→Project inspection→Acceptance

03 Bricklaying Construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Preparation before construction: all wall tiles, floor tiles, doors and windows must be purchased .

● Estimated construction period: around 3 weeks

● Construction process: including pipeline construction → Wall base treatment → Paint the wall waterproof → Lay wall tiles → Paint the floor waterproof → Closed water test → Lay floor tiles → Clean and protect

04 Carpentry construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Preparation before construction: protect the bricks that have been laid;

Construction content: ceiling construction, wall wood base, on-site cabinet production, door panel wiring production.

Estimated construction period: about 2 weeks if there is no on-site carpentry work (such as making cabinets), more than 3 weeks if there is any, depending on the project volume

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Overall construction process: laying out positioning → installation of light steel keel frame → gypsum board facing → cabinet production → wiring and door panel production → wooden base production → door panel installation and debugging → cleaning and protection

Suspended ceiling process: laying out wires → drilling → installing booms → installing keels → making curtain boxes → making air vents → concealed acceptance of keels → installing gypsum boards

Wall wood base: lay out and drill holes → install base keels → make base frame and adjust the level → install decorative panels.

Door panel process: Preparing materials and cutting panels → Selecting decorative panels → Pressing → Edge collection → Edge sealing → Clean edges → Door installation → Installation and debugging

The more carpentry construction projects there are, the longer it will take. If you don’t suspend ceilings or do woodwork, it will be very short;

PS: The wooden floor is not a carpentry construction project, the wooden floor is installed by the merchant.

05 Paint Construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Preparation before construction: Ordinary latex paint is generally provided by decoration companies, but If you want to change products, such as art paint, microcement, etc., you must purchase them in advance.

Estimated construction period: about one month; it should be noted that the paint is greatly affected by the weather. If it encounters continuous rain, The weather prevents construction, so the time will be changedA little longer.

Construction process: wall inspection → brush interface agent → base leveling → hang mesh cloth → scrape putty → polish → apply Apply primer → apply topcoat

Of course, the estimated construction period is calculated based on working days, because the community does not allow construction on rest days; and the larger the amount of the project, the longer the decoration time will definitely be.

The paint is done and the hard decoration is in the final stage!

Hard decoration ends, soft decoration enters the scene

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Mainly required: installation of various finished products and entry of furniture.

Installation projects: ceramic tile seams, wooden floors, various home appliances, customized furniture, etc.

Estimated period: 1-3 weeks, control it yourself.

Ventilation to remove formaldehyde

Can I move in once all the soft furnishings are in? No, ventilation must be used to remove formaldehyde, and the room can only be moved in after the formaldehyde content reaches the standard.

Formaldehyde qualification standard: the maximum allowable concentration of formaldehyde in the room air is 0.08 mg/cubic meter.

The most effective method is: opening windows for ventilation

Auxiliary tools: fresh air system

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Ventilation tips:

①The time can be selected from 10:00 am to 4:00 pm. Windows will not be opened in rainy weather.

②When ventilating, all cabinet doors and drawers should be opened

③You can use screws. Wipe the surface of the cabinet with a dry wet towel to improve ventilation.

④ You can choose a fan to increase air convection.

⑤In low-temperature weather, you can use heating equipment to increase the indoor temperature and then ventilate it, the effect will be better.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

It is inevitable that there will be a lot of things that you don’t understand when decorating for the first time, but as long as you find a decoration method that suits you, clarify the decoration process, and don’t “hands off the shopkeeper”, we will definitely be able to decorate a beautiful home. Home~ I wish you all to live in your new home soon

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2025年1月4日 09:20:15
下一篇 2025年1月4日 09:24:43

相关推荐

  • 入住后才发现,厨房真正好用的设计是这10个,缺一个都不够完美

    厨房,不仅是要实用、简洁,还要兼顾美观、便利、易清洗等等,很多人在装修时并没有太过细致地关注,直到入住后才发现,哪些设计真的好用,哪些华而不实? 经过亲身体验和无数网友的心路史,本期,分享10个真正好用的厨房设计,每一个都至关重要,缺一个都会觉得不够完美。 1、柜门用易擦拭材质 与之相对立的是肤感膜,这两年比较流行,看着却沉稳大气的一种柜门覆膜,使用过的人,…

    门业资讯 2024年2月8日
    300
  • 安徽夫妇把家装得很好看,不信可以看看

    哈喽,大家上午好,今天陈工带大家伙看一套深色系装修,安徽夫妇将“黑暗”进行到底,装修有不少细节值得借鉴,喜欢深色系的可以收藏一下!最近很多人来参观装修,有几个楼上邻居说这套房子装修真心好看,是目前她们看到同户型里装得最漂亮的自家,今天陈工带大家伙一起瞅瞅! 客厅区域 这是一套来自于美丽的安徽省蚌埠市的平层住宅装修,建筑面积135平米,套内面积120平米,户型…

    门业资讯 2024年5月12日
    30
  • 红极一时的砖砌衣柜已“跌落神坛”,看了现在的流行做法,想重装

    砖砌衣柜,相信很多朋友都听说过,可能也了解过。 所谓的砖砌衣柜,就是在两边砌上墙,之后在中间安装金属的型材,就组成了衣柜。 这种砖砌衣柜,在前几年非常火,可以说是红极一时。 但是,现阶段来说,你会发现,很少有人做砖砌衣柜了,可以说已经跌落了神坛。 那么,为什么会出现这种情况呢? 本期分享:砖砌衣柜跌落神坛的原因和替代品。 全部分成两大部分:红极一时的砖砌衣柜…

    门业资讯 2024年9月6日
    930
  • 500元和2000元的电饭煲有何区别?3年换了2个电饭煲,我终于懂了

    文/家居杂坛 对于电饭煲,我们每家每户几乎都会使用。 可是,大家也会发现,电饭煲的价格差异还是很大的。 常见的电饭煲,有几百元一个的,也有一两千元一个的。 对于这些不同价格的电饭煲,到底有什么区别呢? 500元的电饭煲和2000元的电饭煲有何区别?我也是三年换了两个电饭煲,才弄懂。 你知道500元的电饭煲和2000元的电饭煲有什么区别吗? 500元的电饭煲,…

    门业资讯 2024年2月15日
    900
  • Sichuan: Special cars and trains deliver workers to their posts with precise delivery to their doorsteps

    Spring is good and work is busy again. Recently, more than 600 Sichuan migrant workers took high-speed trains from Chengdu East Railway Station and Mianyang Railway Station to Guan…

    门业资讯 2024年12月21日
    30

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信