Preparation before decoration

Does decoration start with construction? No! Preparation in the early stage of decoration is also a very important part of decoration.

01 Confirm decoration needs

The first step in decoration is to confirm your decoration needs!

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Confirm the decoration needs include: How many people live there permanently? How many bedrooms are left? How many bathrooms are left? Whether there is any renovationRequire? Is there any space you wish to add through design? What style of decoration do you like? Ask yourself these questions first, list the results, and clarify your needs, so that you will not be confused about decoration!

02 Choose decoration method

After confirming your decoration needs, you need to choose the decoration method that suits you! There are three decoration methods: full package, clear package, and half package.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Full package: from design to construction to purchasing materials, the decoration company takes care of everything. The owner is responsible for paying and moving in; this is the most worry-free, but the owner will have less initiative in decoration. Suitable for owners who are completely time-poor.

Clear package: Completely opposite to full package, from design to construction to purchasing materials, everything is managed by the owner himself; time-consuming and labor-intensive, And the requirements for the owner’s own decoration experience are high.

Half package: between the first two, the decoration company is responsible for design + construction + auxiliary materials; the owner is responsible for purchasing the main materials Furniture and appliances; owners have the initiative to decorate, but they don’t have to worry too much, and they buy the main furniture and appliances themselves, so they don’t have to worry about the decoration company shoddy.

In general:

● Full package is suitable for owners who have no time to decorate;

● Clear package is suitable for owners who have time and decorateOwners with rich repair experience;

● Half package is suitable for most office workers who want to participate in decoration but don’t want to spend too much energy.

03 Find a decoration company

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Decoration company: an ordinary decoration company, popular decoration, quite satisfactory, and the cost is in the middle.

Design company: Customized design, the effect is more beautiful and practical, and will design and plan according to the needs of the owner; however, the design fee will cost more than Ordinary decoration companies are a bit higher.

Construction team: only responsible for construction, not design.

Road decoration team: only responsible for the construction of a certain type of work, without after-sales guarantee.

Not many suggestions, just choose according to your needs! In addition, you also need to make your own budget!

Hard decoration under construction

When everything is ready, we will enter the hard decoration construction stage!

01Demolition and reconstruction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Construction content: demolition of walls and new construction; demolition of original finely decorated second-hand houses decorate.

● Estimated construction period: 2-3 days for new rough houses, and about one week for second-hand houses/old houses/furnished houses.

● Construction precautions: All load-bearing walls, beams, public facilities, etc. cannot be demolished.

02 Water and electricity construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Preparation before decoration: need to confirm the location and size of all electrical appliances; confirm all switches The number of socket locations; central air conditioning and floor heating must be installed before water and electricity are started.

● Estimated construction period: 2-3 weeks. The larger the area, the longer it will take.

Designers will design the switches and sockets, so you basically don’t have to worry about them yourself; central air conditioners, etc. are also installed by merchants.

The most important thing we need to pay attention to is to confirm the size and position of all electrical appliances, because different products will definitely have different sizes. ; It is not necessary to buy it, but the most basic style must be confirmed.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Formal construction process: water and electricity disclosure → water and electricity estimate → material arrival → release Wire grooving→Strong and weak electric pipes→Water supply and drainage pipes→Strong electric box sorting→On-site cleaning→Project inspection→Acceptance

03 Bricklaying Construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

● Preparation before construction: all wall tiles, floor tiles, doors and windows must be purchased .

● Estimated construction period: around 3 weeks

● Construction process: including pipeline construction → Wall base treatment → Paint the wall waterproof → Lay wall tiles → Paint the floor waterproof → Closed water test → Lay floor tiles → Clean and protect

04 Carpentry construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Preparation before construction: protect the bricks that have been laid;

Construction content: ceiling construction, wall wood base, on-site cabinet production, door panel wiring production.

Estimated construction period: about 2 weeks if there is no on-site carpentry work (such as making cabinets), more than 3 weeks if there is any, depending on the project volume

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Overall construction process: laying out positioning → installation of light steel keel frame → gypsum board facing → cabinet production → wiring and door panel production → wooden base production → door panel installation and debugging → cleaning and protection

Suspended ceiling process: laying out wires → drilling → installing booms → installing keels → making curtain boxes → making air vents → concealed acceptance of keels → installing gypsum boards

Wall wood base: lay out and drill holes → install base keels → make base frame and adjust the level → install decorative panels.

Door panel process: Preparing materials and cutting panels → Selecting decorative panels → Pressing → Edge collection → Edge sealing → Clean edges → Door installation → Installation and debugging

The more carpentry construction projects there are, the longer it will take. If you don’t suspend ceilings or do woodwork, it will be very short;

PS: The wooden floor is not a carpentry construction project, the wooden floor is installed by the merchant.

05 Paint Construction

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Preparation before construction: Ordinary latex paint is generally provided by decoration companies, but If you want to change products, such as art paint, microcement, etc., you must purchase them in advance.

Estimated construction period: about one month; it should be noted that the paint is greatly affected by the weather. If it encounters continuous rain, The weather prevents construction, so the time will be changedA little longer.

Construction process: wall inspection → brush interface agent → base leveling → hang mesh cloth → scrape putty → polish → apply Apply primer → apply topcoat

Of course, the estimated construction period is calculated based on working days, because the community does not allow construction on rest days; and the larger the amount of the project, the longer the decoration time will definitely be.

The paint is done and the hard decoration is in the final stage!

Hard decoration ends, soft decoration enters the scene

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Mainly required: installation of various finished products and entry of furniture.

Installation projects: ceramic tile seams, wooden floors, various home appliances, customized furniture, etc.

Estimated period: 1-3 weeks, control it yourself.

Ventilation to remove formaldehyde

Can I move in once all the soft furnishings are in? No, ventilation must be used to remove formaldehyde, and the room can only be moved in after the formaldehyde content reaches the standard.

Formaldehyde qualification standard: the maximum allowable concentration of formaldehyde in the room air is 0.08 mg/cubic meter.

The most effective method is: opening windows for ventilation

Auxiliary tools: fresh air system

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

Ventilation tips:

①The time can be selected from 10:00 am to 4:00 pm. Windows will not be opened in rainy weather.

②When ventilating, all cabinet doors and drawers should be opened

③You can use screws. Wipe the surface of the cabinet with a dry wet towel to improve ventilation.

④ You can choose a fan to increase air convection.

⑤In low-temperature weather, you can use heating equipment to increase the indoor temperature and then ventilate it, the effect will be better.

Don’t be a “hands-off shopkeeper” when it comes to decorating. This summary of the decorating process explains it in great detail! Please refer to

It is inevitable that there will be a lot of things that you don’t understand when decorating for the first time, but as long as you find a decoration method that suits you, clarify the decoration process, and don’t “hands off the shopkeeper”, we will definitely be able to decorate a beautiful home. Home~ I wish you all to live in your new home soon

本站内容及图片来自网络,版权归原作者所有,内容仅供读者参考,不承担相关法律责任,如有侵犯请联系我们:609448834

(0)
华夏门网's avatar华夏门网
上一篇 2025年1月4日 09:20:15
下一篇 2025年1月4日 09:24:43

相关推荐

  • 小镇女孩晒美式乡村的家,老家具简单中性色调自然舒适,让人慕了

    “我宁愿相信每个人都是独立的。我们的第一要务从来都是我们自己,我们得尽力过好。” ——理查德·耶茨 每个人都有过去现在和将来。对我们来讲,无论过去发生了什么,都已经过去。无论你对将来有多少的想象,都还没有发生。所以,记得活着当下,珍惜身边人和周围的美好事物,才会更加幸福。 ▲女主Grace 女主Grace出生成长在美国路易斯安那州的小镇,如今一家人生活在一栋…

    门业资讯 2024年10月17日
    120
  • 越来越多人不把冰箱放在厨房,现在流行这4种设计,那才叫高级

    传统家装布局,大都是把冰箱放在厨房。 可是,由于户型的变化,导致不得不改变这种想法。现在的年轻人,也是脑洞大开。 于是,出现了不少更好的摆放冰箱的方式。 其实,冰箱只要能方便使用,对冰箱并没有什么伤害,放哪里都是可以的。你说是吗? 本期分享:冰箱不放厨房的方案。全文分成两大部分:为何越来越多人不在厨房放冰箱?现在流行哪些设计? 为何越来越多人不在厨房放冰箱?…

    门业资讯 2024年11月24日
    360
  • 壹点帮办丨装修橱柜门有磨损,拖了近三年没解决 商家:更换新门

    见习记者 鹿青松 孔亚捷 装新房、搬新家本是一件喜事,家住济南市龙湖明景台的李女士却因为装修新橱柜装遇到了烦心事,拖了近三年仍然没有解决。近日,李女士向齐鲁晚报·齐鲁壹点反映,她在2020年装修房子时选择了家装品牌“好莱客”定制橱柜,其中一套橱柜门在安装调换的过程中发生了摩擦损伤,厂商当时答应售后却迟迟未解决,这一拖就是快三年了。 装修橱柜有损坏,拖了三年未…

    门业资讯 2024年8月28日
    120
  • 看过无数凌乱的家,发现6个家居问题,最后一条是中国家庭的通病

    想要提升财运,改变命运吗?那就赶紧关注我吧!点赞评论,更有机会获得独家转运秘籍哦!祝您财运亨通,心想事成! 你是否也曾被这样的场景困扰:刚收拾好的客厅,转眼就被孩子玩具和散落的杂物“攻占”;精心整理的衣柜,总会出现几件“离家出走”的衣服;厨房水槽边永远堆积着来不及清洗的锅碗瓢盆…… 家,本该是温馨舒适的港湾,却常常因为“乱”而让人心生烦躁,你或许会抱怨,为什…

    门业资讯 2024年9月27日
    120
  • “智能化”会是国货家居的制胜武器吗? | 品牌新事

    “赚到六便士后,国货卫浴抬头看向月亮。” 文 / 蛙小吉 就像当年智能化趋势席卷全球手机市场一样,家居行业也迎来了“家庭场景智能化”的浪潮——在今年的中国国际厨房、卫浴设施展览会上(Kitchen&Bath China 2024),智能产品几乎成了每个品牌的标配。 过去十几年来,卫浴行业和汽车行业一样,保持着小修小改再卖10年的步调。 因为对成熟品类的领先者…

    门业资讯 2024年5月19日
    100

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:[email protected]

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信